Possibility of application of fuzzy logic for stability assessment of underground facilities
Објеката
- Тип
- Рад у зборнику
- Верзија рада
- објављена
- Језик
- енглески
- Креатор
- Luka Crnogorac, Rade Tokalić, Đurica Nikšić, Saša Jovanović
- Извор
- Mining and environmental protection, Vrdnik, 25 - 28 September 2019
- Издавач
- University of Belgrade, Faculty of Mining and geology
- Датум издавања
- 2019
- Сажетак
-
Rudnici sa podzemnom eksploatacijom uglja u Republici Srbiji deo su Javnog preduzeća za podzemnu eksploataciju uglja Resavica (JP PEU). U rudnicima kompanije JP PEU podzemne prostorije se trenutno grade tehnologijom bušenja i miniranja. Ova metoda, koja se koristi u srpskim rudnicima uglja, pokazala je svojom brzinom, efikasnošću, troškovima i drugim elementima da više nije prihvatljiva. Klasičan metod izgradnje podzemnih prostorija ne omogućava zadovoljavajuću produktivnost, jer se tehnološke operacije ovog metoda, bušenje i miniranje, izvode ručno i zahtevaju neprihvatljivo mnogo vremena.
S obzirom na ovu činjenicu, kao i na ranija kašnjenja u otvaranju i pripremi novih proizvodnih kapaciteta, trenutni metod njihove pripreme vodi ka stagnaciji u širenju sistema prostorija u rudnicima i ne omogućava povećanje proizvodnje uglja. Da bi se povećala proizvodnja uglja i otvorili novi kopovi i rudarska polja, neophodno je razmotriti primenu produktivnijih metoda izgradnje podzemnih prostorija, odnosno primenu mašina za njihovu izgradnju.
Nabavka nove opreme zahteva velika ulaganja, te je potrebno sprovesti detaljnu analizu tehnološkog procesa podzemne eksploatacije i odabrati mašinu za izgradnju podzemnih prostorija koja će ispuniti postavljene uslove. Za pravilnu selekciju mašine za izgradnju podzemnih prostorija u uslovima srpskih rudnika uglja, korišćena je višekriterijumska analiza, kako je opisano u ovom radu. - The mines with underground exploitation of coal in the Republic of Serbia are part of the Public Enterprise for Underground Exploitation of Coal Resavica (JP PEU). In the mines of the company JP PEU, underground rooms are presently being construction by the technology of drilling and blasting works. This method which is used in Serbian coal mines, has shown with its speed, performance, costs and other elements that it is not acceptable anymore. Classical method of construction of underground rooms does not allow satisfying performance, because technological operations of this method, drilling and blasting are performing manually and require unacceptably big time consuming. Regarding this fact and also earlier delays of opening and preparing new production capacities, present method of their preparation guides to stagnation in spreading room system in mines and does not allow increasing of coal production. In order to increase coal production and opening of new pits and mining fields, it is necessary to consider the application of more productive methods of construction of underground rooms, i.e. application of machines for construction of underground rooms. Procurement of new equipment requires large investments, therefore it is necessary to carry out a detailed examination of the technological process of pit production and to select a machine for the construction of underground rooms that will meet the specified conditions. In order to properly select the machine for construction of underground rooms for the conditions of coal mines in Serbia, a multi-criteria analysis was used, as given in this paper.
- isbn
- 978-86-7352-354-5
- Subject
- analiza, podzemna prostorija, mehanizovana izgradnja, rudnik
- analysis, underground room, mechanized building, mine
- Шира категорија рада
- М30
- Ужа категорија рада
- М33
- Права
- Отворени приступ
- Лиценца
- Creative Commons – Attribution-NonComercial 4.0 International
- Формат
Luka Crnogorac, Rade Tokalić, Đurica Nikšić, Saša Jovanović . "Possibility of application of fuzzy logic for stability assessment of underground facilities" in Mining and environmental protection, Vrdnik, 25 - 28 September 2019, University of Belgrade, Faculty of Mining and geology (2019)
This item was submitted on 8. јануар 2025. by [anonymous user] using the form “Рад у зборнику радова” on the site “Радови”: http://gabp-dl.rgf.rs/s/repo
Click here to view the collected data.