Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
Објеката
- Тип
- Рад у зборнику
- Верзија рада
- објављена
- Језик
- енглески
- Креатор
- Nemanja Stanić, Dragoslav Rakić, Josip Isek, Slavoljub Simić
- Извор
- Proceedings of the 5th International Conference on Transportation Geotechnics
- Издавач
- Springer Nature Singapore
- Датум издавања
- 2024
- Сажетак
- In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were defined as a part of the General Metro Construction Project. The lines are designed to intersect at the location of Sava Square, where an interchange metro station will be built. It represents a complex geotechnical structure consisting of three different parts: a part of the metro station for line 1, a part of the metro station for line 2 and a common part for both metro lines. Due to the complexity of construction and different depths of the diaphragm walls, deeper than 40 m on the part of metro line 2, phased construction is planned. In this regard, determination of geotechnical modelling for each part separately as well as geotechnical design are presented including the analysis of: phased methods of excavation, influence of pore and effective stresses on the stability of the diaphragm wall, lateral and vertical displacements as well as the interaction between diaphragm walls and reinforced concrete slabs.
- почетак странице
- 113
- крај странице
- 119
- doi
- 10.1007/978-981-97-8221-5_11
- isbn
- 978-981-97-8217-8
- issn
- 2366-2557
- Subject
- metro station, geotechnical modelling, displacements
- metro stanica, geotehničko modelovanje, pomeranja
- Шира категорија рада
- М30
- Ужа категорија рада
- М33
- Права
- Отворени приступ
- Лиценца
- All rights reserved
- Формат
- Медија
- ICTG_Australija_2024.pdf
Nemanja Stanić, Dragoslav Rakić, Josip Isek, Slavoljub Simić. "Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One" in Proceedings of the 5th International Conference on Transportation Geotechnics , Springer Nature Singapore (2024). https://doi.org/10.1007/978-981-97-8221-5_11
This item was submitted on 31. децембар 2024. by [anonymous user] using the form “Рад у зборнику радова” on the site “Радови”: http://gabp-dl.rgf.rs/s/repo
Click here to view the collected data.