Model for estimation of stress field in the earth's crust
Slavko Torbica, Veljko Lapčević (2016)Slavko Torbica, Veljko Lapčević. "Model for estimation of stress field in the earth's crust" in Podzemni radovi (2016). https://doi.org/10.5937/podrad1628009T М51
-
Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)
The construction of the highway E-80 has begun in Serbia, which will represent the traffic hub of the Western Balkans and will be part of the main regional transport network of Southeast Europe. Its total length through Serbia is 77 km, and one part of the route is designed through a typical plain terrain, while a larger part of the route passes through hilly terrain. The construction of the tunnel “Debelo brdo” is planned partly in an open cut ...Dragoslav Rakić, Irena Basarić Ikodinović, Radojica Lapčević, Dragan Lukić. "Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)" in Proceedings of the XVIII ECSMGE 2024 geotechnical engineering challenges to meet current and emerging needs of society, Lisbon, 26-30 August 2024, CRC Press (2024). https://doi.org/10.1201/9781003431749-356 М33
-
The importance of geotechnical data for deep excavation in urban centres
Rakić Dragoslav, Čaki Laslo (2012)Rakić Dragoslav, Čaki Laslo. "The importance of geotechnical data for deep excavation in urban centres" in Drugi međunarodni naučni skup Stanje i pravci razvoja građevinarstva - GTZ 2012 i Drugo savjetovanje GEO-EXPO 2012 : zbornik radova = 2nd international scientifinc meeting State and Trends of civil enginnering GTZ 2012 and 2nd Conference GEO-EXPO 20, Tuzla, BIH:Rudarsko-geološko-građevinski fakultet (2012): 541-548 M33
-
Lost production costs of the overburden excavation system caused by rubber belt failure
Bugarić Uglješa, Tanasijević Miloš, Polovina Dragan, Ignjatović Dragan, Jovančić Predrag. "Lost production costs of the overburden excavation system caused by rubber belt failure" in Journal of Maintenance and Reliability 14 no. 4, :Polish Maintenance Society (2012): 333-341 M23
-
Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka
Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović (2015)Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović. "Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka" in Mining and Metalurgy Engineering Bor no. 2, Bor:Mining and Metallurgy Institute, Bor (2015): 29-52. https://doi.org/10.5937/MMEB1502029Z M24
-
Rock excavation methods in urban areas
Stefan Milanović, Lazar Kričak, Milanka Negovanović, Nikola Simić, Jovan Marković, Nikola Đokić (2023)Povećan obim građevinskih radova, koji podrazumevaju izgradnju novih stambenih i poslovnih objekata, hotela, garaža, tržnih centara i slično, sve je češći u urbanim sredinama. Ovakvi radovi sve više dolaze u kontakt sa različitom vrstom problema prilikom izgradnje, kao jedan od tih problema izdvajamo pojavu čvrste stenske mase prilikom otkopavanja na lokacijama izgradnje budućih objekata predviđenih građevinskim projektom. Prilikom izgradnje objekata tj. dela objekta koji podrazumeva podzemne prostorije nekog objekta, potrebno je vršiti iskop materijala na lokaciji, međutim taj materijal ...Stefan Milanović, Lazar Kričak, Milanka Negovanović, Nikola Simić, Jovan Marković, Nikola Đokić. "Rock excavation methods in urban areas" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2023). https://doi.org/10.5937/podrad2342047m М51
-
Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit
Sanja Bajić, Dragoljub Bajić, Branko Glušćević, Radmila Gaćina. "Application of VIКOR method in the selection of an optimal splution of excavation “Borska Reka” ore deposit" in 9th International Conference Mining and Environmental protection MEP, 24 – 27 May 2023, Sokobanja, Serbia , Belgrade : University of Belgrade-Faculty of mining and geology (2023) М33
-
Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija
Srđan D. Kostić (2013-11-04)U ovoj disertaciji, cilj istraživanja bio je određivanje dinamičkih svojstava potresaizazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija.Analiza potresa izvedena je sa dva aspekta – u prvom delu istraživanja izučavane suvremenske serije oscilovanja tla za vreme potresa, a u drugom delu vršena je analizastabilnosti fenomenološkog Baridž-Knopof modela bloka sa oprugom. Vremenske serijeoscilovanja tla proučavane su primenom postupka analize surogat podataka, kao ikorišćenjem metoda analize nelinearnih vremenskih serija (primena teoreme orazvijanju skalarne vremenske serije). Analiza vremenskih serija izvedena je ...potres, naponsko stanje, podzemne prostorije, bifurkacije, vremenskaserija, deterministički haos, stohastičnost, perturbacije, vremensko kašnjenje, jačina trenjaSrđan D. Kostić. "Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2013-11-04)
-
Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik
Tunel „Debelo brdo“ nazvan je po najizraženijem relјefnom obliku na ovoj drugoj deonici autoputa E-80 Niš – Pločnik. Osnovnu geološku građu na lokaciji tunela čini Mio-Plioceni kompleks heterogenog litološkog sastava. Izgradnja tunela je predviđena delom u otvorenom iskopu dužine 240 m, a delom sa podzemnim iskopom dužine 190 m. U zoni tunela, padina je okarakterisana kao uslovno stabilna, pa bi neadekvatna zasecanja mogla da izazovu klizanja terena. Iz tih razloga, u okviru rada posebno su prikazani geotehnički uslovi izgradnje ...Dragoslav Rakić, Radojica Lapčević, Irena Basarić Ikodinović, Dragan Lukić. "Geotehnički uslovi izgradnje tunela „Debelo brdo“ na autoputu E-80 Niš - Pločnik" in Četvrti Srpski kongres o putevima, 2-3. jun 2022., Beograd : Srpsko društvo za puteve Via Vita (2022) М33
-
Field Zoning According to the Possibility of Applying Mechanized Excavation With a Longwall Below the Town of Gacko
Dragana Savić, Jelena Majstorović (2021)Mogućnost povećanja korišćenja resursa čvrstog energetskog goriva u procesu rešavanja energetske krize koja je sve prisutnija u širem regionu, jeste pravi izazov rudarske nauke. Podzemna eksploatacija uglja je složen proizvodni proces koji objedinjuje više tehnoloških postupaka u jedinstvenu celinu: izradu podzemnih prostorija, otkopavanje, transport i izvoz, ventilaciju proizvodnog sistema, odvodnjavanje, servisiranje objekata i sistema, zaštitu i sigurnost rada. Jedan od osnovnih problema koji prati podzemnu eksploataciju uglja jeste stabilnost podzemnih prostorija i deformacije na površini terena, jer su podzemne ...mehanizovano otkopavanje, mehanizovano široko čelo, zoniranje terena, modeliranje, stabilnost, sleganje, stabilnost kosinaDragana Savić, Jelena Majstorović. "Field Zoning According to the Possibility of Applying Mechanized Excavation With a Longwall Below the Town of Gacko" in 10 th International Conference Coal 2021 Zlatibor, 13-16 October 2021, Jugoslovenski komitet za površinsku eksploataciju (2021) М33
-
Experimental determination of best performing cut in Lece underground mine
Slavko Torbica, Miodrag Duranović, Nenad Gramić, Veljko Lapčević, Miloš Čolović. "Experimental determination of best performing cut in Lece underground mine" in Podzemni radovi (2020). https://doi.org/10.5937/podrad1935049T М51
-
Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”
Since 1976 cement marl excavation at open-pit mine „Filijala” is carried out by continuous exploitation technology using bucket wheel excavator SH 400 manufactured by Orenstein und Koppel (O & K) company. Due to the bucket wheel excavator time-worn and high operating cost it was necessary to replace it with new one. In order to test the new bucket wheel excavator and prove its capacity a testing zone was defined as test block for excavation, in which the bucket wheel ...Vladimir Čebašek, Nebojša Gojković, Veljko Rupar, Miodrag Pribićević. "Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”" in Рударски гласник, Рударски институт - Београд (2020). https://doi.org/10.25075/BM.2020.07 М51
-
First insights into the Mesolithic settlement of Southern Serbia - Excavation of the Pešterija Cave in the Ponišavlje Region
Dušan Mihailović, Ivana Živaljević, Vesna Dimitrijević, Sofija Dragosavac, Danilo Pajović, Anđa Petrović, Katarina Bogićević, Dragana Đurić, Mirela Djurović, Steven Kuhn, Mirjana Roksandić (2024)Ranoholocenski lokaliteti u Srbiji su do sada bili poznati samo iz oblasti Đerdapske klisure. Neki arheolozi tvrde da je očigledan nedostatak mezolitskih lokaliteta posledica neadekvatnog istraživanja u ovoj oblasti, dok drugi pretpostavljaju da ekološki uslovi u centralnom Balkanu tokom ranog holocena možda nisu bili povoljni za život zajednica lovaca-sakupljača. Međutim, suprotno dosadašnjim mišljenjima, novija istraživanja pećina u istočnoj Srbiji otkrila su da su ljudi ipak naseljavali ovu oblast tokom mezolita. Tragovi naseljavanja mezolitskih grupa, koji datiraju sve do 7. ...Dušan Mihailović, Ivana Živaljević, Vesna Dimitrijević, Sofija Dragosavac, Danilo Pajović, Anđa Petrović, Katarina Bogićević, Dragana Đurić, Mirela Djurović, Steven Kuhn, Mirjana Roksandić. "First insights into the Mesolithic settlement of Southern Serbia - Excavation of the Pešterija Cave in the Ponišavlje Region" in Documenta Praehistorica, University of Ljubljana (2024). https://doi.org/10.4312/dp.51.7 М24
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi: Criteria optimization, Belgrade, June 2024" in Podzemni radovi, Beograd, jun 2024, Centre for Evaluation in Education and Science (CEON/CEES) (2024). https://doi.org/10.5937/podrad2444071B М51
-
Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija
Srđan D. Kostić (2013-11-04)U ovoj disertaciji, cilj istraživanja bio je određivanje dinamičkih svojstava potresaizazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija.Analiza potresa izvedena je sa dva aspekta – u prvom delu istraživanja izučavane suvremenske serije oscilovanja tla za vreme potresa, a u drugom delu vršena je analizastabilnosti fenomenološkog Baridž-Knopof modela bloka sa oprugom. Vremenske serijeoscilovanja tla proučavane su primenom postupka analize surogat podataka, kao ikorišćenjem metoda analize nelinearnih vremenskih serija (primena teoreme orazvijanju skalarne vremenske serije). Analiza vremenskih serija izvedena je ...potres, naponsko stanje, podzemne prostorije, bifurkacije, vremenskaserija, deterministički haos, stohastičnost, perturbacije, vremensko kašnjenje, jačina trenjaSrđan D. Kostić. "Nelinearno dinamičko modelovanje potresa izazvanih promenom naponskog stanja pri izradi horizontalnih podzemnih prostorija" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2013-11-04)
-
Possibility of application of fuzzy logic for stability assessment of underground facilities
Rudnici sa podzemnom eksploatacijom uglja u Republici Srbiji deo su Javnog preduzeća za podzemnu eksploataciju uglja Resavica (JP PEU). U rudnicima kompanije JP PEU podzemne prostorije se trenutno grade tehnologijom bušenja i miniranja. Ova metoda, koja se koristi u srpskim rudnicima uglja, pokazala je svojom brzinom, efikasnošću, troškovima i drugim elementima da više nije prihvatljiva. Klasičan metod izgradnje podzemnih prostorija ne omogućava zadovoljavajuću produktivnost, jer se tehnološke operacije ovog metoda, bušenje i miniranje, izvode ručno i zahtevaju neprihvatljivo mnogo ...Luka Crnogorac, Rade Tokalić, Đurica Nikšić, Saša Jovanović . "Possibility of application of fuzzy logic for stability assessment of underground facilities" in Mining and environmental protection, Vrdnik, 25 - 28 September 2019, University of Belgrade, Faculty of Mining and geology (2019) М33
-
Analiza sistema odvodnjavanja površinskog kopa Drmno od podzemnih voda sa severnim savršenim ekranom
Izrada nesavršenog ekrana do drugog sloja uglja na površinskom kopu Drmno, pored zadržavanja postojećih standardnih metoda odvodnjavanja od podzemnih voda linijama bunara, predviđena je poslednje decenije u celokupnoj rudarskoj projektnoj dokumentaciji. Iz objektivnih i subjektivnih razloga njegova realizacija nije ostvarena do danas. U međuvremenu je, uz dodatna geološka istraživanja i promenu dinamike i parametara sistema površinske eksploatacije, došlo do određenih značajnih prostornih promena geoloških i rudarskih uslova u eksploatacionom polju. Ovo je omogućilo preliminarno inoviranje pristupa procesu i konceptu ...Tomislav Šubaranović, Dušan Polomčić, Vladimir Pavlović. "Analiza sistema odvodnjavanja površinskog kopa Drmno od podzemnih voda sa severnim savršenim ekranom" in Zbornik apstrakata sa 9. Međunarodne konferencije Ugalj, Zlatibor, 2019., Jugoslovenski komitet za površinsku eksploataciju (2019) М34
-
Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi – criteria optimization
Sanja Bajić, Dragoljub Bajić, Branko Gluščević, Radmila Gaćina, Josip Išek. "Definition of criteria and alternatives for choosing the optimal mining method deposits when applying multi – criteria optimization" in Underground mining engineering, University of Belgrade, Faculty of Mining and Geology (2024) М53
-
Reducing environmental impact caused by mining activities in limestone mines
Radmila Gaćina, Bojan Dimitrijević (2022)Mining and its related activities have always resulted in changes in the environment and these changes can vary from one area to another. As a result of mining, several types of changes can be distinguished: destruction of land and existing vegetation, changes in terrain topography, modification in air quality, changes in surface and groundwater quality, as well as change geotechnical conditions of the rock. Environmental impact of mining have been a public concern. There is widespread global interest in mining ...Radmila Gaćina, Bojan Dimitrijević. "Reducing environmental impact caused by mining activities in limestone mines" in Underground mining engineering , Belgrade : University of Belgrade - Faculty of Mining and Geology (2022) М51
-
Primena digitalne fotogrametrije u rudniku Rudnik
Digitalna fotogrametrija, lasersko skeniranje i virtuelizacija sve više pronalaze aktivne uloge u rudarstvu, prvenstveno zbog svoje široke mogućnosti primene. Laserskim skeniranjem i fotogrametrijom snimaju se i kreiraju 3D modeli otkopa, jamskih hodnika, površinskih kopova, površinskih objekata (zgrada, spomenika, predmeta), a vrši se skeniranje celih rudnika koji se rekonstruišu u 3D digitalne modele. Fotogrametrija predstavlja proces fotografisanja objekata pomoću fotoaparata i daljom obradom fotografija u različitim softverskim alatima kreiraju se realne kopije 3D modela objekata ili predmeta u digitalnoj formi. Za ...Nikola Mirković, Luka Crnogorac, Katarina Urošević. "Primena digitalne fotogrametrije u rudniku Rudnik" in XI Međunarodna konferencija ugalj i kritični minerali CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023) М33