Extreme Rainfall Event and Its Aftermath Analysis—IPL 210 Project Progress Report
Biljana Abolmasov, Mileva Samardžić Petrović, Ranka Stanković, Miloš Marjanović, Jelka Krušić, Uroš Đurić (2021)Biljana Abolmasov, Mileva Samardžić Petrović, Ranka Stanković, Miloš Marjanović, Jelka Krušić, Uroš Đurić. "Extreme Rainfall Event and Its Aftermath Analysis—IPL 210 Project Progress Report" in Understanding and Reducing Landslide Disaster Risk, Springer International Publishing (2021). https://doi.org/10.1007%2F978-3-030-60196-6_19
-
IPL Project 210 – Massive landsliding in Serbia following Cyclone Tamara in May 2014 - progress report
Abolmasov Biljana, Marjanović Miloš, Đurić Uroš, Samardžić Petrović Mileva, Krušić Jelka. "IPL Project 210 – Massive landsliding in Serbia following Cyclone Tamara in May 2014 - progress report" in Proceeding of IPL Symposium on Landslides 2018, Organized by International Consortium on Landslides (ICL) 1, Kyoto, Japan:International Consortium on Landslides (2018)
-
IPL Project 181 – Study of slow moving landslide Umka near Belgrade, Serbia – progress report for 2017 & 2018
Đurić Uroš, Abolmasov Biljana, Marjanović Miloš, Samardžić Petrović Mileva, Pejić Marko, Brodić Nenad, Popović Jovan (2018)Đurić Uroš, Abolmasov Biljana, Marjanović Miloš, Samardžić Petrović Mileva, Pejić Marko, Brodić Nenad, Popović Jovan. "IPL Project 181 – Study of slow moving landslide Umka near Belgrade, Serbia – progress report for 2017 & 2018" in Proceeding of IPL Symposium on Landslides 2018, Organized by International Consortium on Landslides (ICL) 1, Kyoto, Japan:International Consortium on Landslides (2018)
-
Project BEWARE—Landslide Post-disaster Relief Activities for Local Communities in Serbia
Biljana Abolmasov, Dobrica Damjanović, Miloš Marjanović, Ranka Stanković, Velizar Nikolić, Sandra Nedeljković, Žarko Petrović (2017)... ities and prototypes on GIS web portal. WP10—Follow-up—Concluding the project by replicating a meeting with WP2 protagonists and presenting the final report with key deliverables and future perspectives. Project Results BEWARE project was implemented by the Geological Survey of Serbia, and the University ...
... stan- dardized and accurate landslide event report. Those RPs were supported by username and password for uploading and downloading data from BEWARE web portal. Fig. 2 Geographical position of 27 municipalities in Serbia involved in BEWARE project (pink) 416 B. Abolmasov et al. Two municipalities ...
... our country in May 2014. In this paper we are presenting main BEWARE project activities and results implemented on 27 municipalities in Serbia after May 2014 event. Project Description Main Project Objectives Main project objectives were structured as follows: 1. Enhancing municipal capacities/Civil ...Biljana Abolmasov, Dobrica Damjanović, Miloš Marjanović, Ranka Stanković, Velizar Nikolić, Sandra Nedeljković, Žarko Petrović. "Project BEWARE—Landslide Post-disaster Relief Activities for Local Communities in Serbia" in Advancing Culture of Living with Landslides, Proceedings of 4th World Landslide Forum, Ljubljana 29 May-02 June 2017 3, Berlin : Springer Interantional (2017). https://doi.org/10.1007/978-3-319-53487-9_48
-
Analysis Of the Process Of Carbon Capture Utilization And Storage In Underground Reservoirs
John Nyame (2024)The importance of mitigating the effects of global climate change has necessitated an in-depth exploration of innovative strategies to reduce carbon dioxide (CO2) emissions. Among these strategies, Carbon Capture, Utilization, and Storage (CCUS) has emerged as a promising and transformative solution. This master thesis delves into the diverse realm of CCUS processes, aiming to unravel the positives challenges, and opportunities within this dynamic field. The analysis begins with a systematic examination of carbon capture technologies, encompassing post-combustion, pre-combustion, and oxy-fuel combustion ...... annually and has the capacity to store up to I7Mt CO>. The Weyburn CO- project in Canada started operations in 2000 with capacity to store up to 20Mt CO». According to the report of the Global Carbon Capture and Storage Institute, the capture capacity of operating large-scale CCS facilities has ...
... construction and planning [93]. The three projects in large scale operations today include the Sleipner project in Norway, In Salah project in Algeria and Weyburn EOR project in Canada. The Sleipner project which is operated by Equinor in Norway is first large-scale CO- storage in the world started in ...
... has the capacity to store 1-10 Gt of CO-. The Sleipner project is presented as a case study with the technical and economic trends of the project. The In Salah project in Algeria operated by BP is the first large scale CO> storage project in a gas reservoir started in 2004, stores 1.2Mt CO annually ...John Nyame. Analysis Of the Process Of Carbon Capture Utilization And Storage In Underground Reservoirs, 2024
-
WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2015)... obtain a report of all data on an abandoned mine: register, titleholder, objects, coordinates, properties, evaluation, as well as the register of abandoned mines by municipalities, with the most important supporting information, the possibility of linking with the previous report, the report on abandoned ...
... abandoned mines, with evaluations and evaluation criteria. Report on ranked abandoned mines with evaluations and a list of business partners with and without registered abandoned facilities, but with mandatory status, are also available. The user can select to print a single record of an abandoned ...
... databases on the territory of the Republic of Serbia. Keywords: WebGIS, Geodatabase, Abandoned mines, Mine reclamation. 1. INTRODUCTION Project "Cadastre of abandoned mines on the territory of the Autonomous Province of Vojvodina and accompanying database" was realized by University of Belgrade ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "WebGIS Cadastre of Abandoned Mines in Autonomous Province of Vojvodina" in Proceedings of the 5th International Symposium Mining And Environmental Protection,June 10-13,2015, Vrdnik, Serbia, Belgrade : Faculty of Mining and Geology (2015)
-
Towards Sustainable Management of Transboundary Hungarian-Serbian Aquifer
Zoran Stevanović, Peter Kozák, Milojko Lazić, Janos Szanyi, Dušan Polomčić, Balazs Kovács, Jozsef Török, Saša Milanović, Bojan Hajdin, Petar Papić (2011)... t of both countries. Within the framework of the International Commission for the Protection of ihe Danube River (ICPDR) activities and the Roof Report for 2004 [6], the transboundary acluifer system of Hungary-Serbia was preliminary separated into two parts: one large GW body in Serbia named CS-DU ...
... University of Alberta. Alberta. 6 Djurif, D., Josipovid, J.,Zogovi{D.' I(omatina, M., Stevanovi{ 2., Diokt{ I. and Luk16, V. (2005) ICPDR Roof Report {or 2004,lnstitute WM "iarosiav Cerni", Document of MinistrY of Agrlculture Forest and Wateq Belgrade. 7 Soro, A., Dimki6, M. and |osiPovi6, ]' ...
... Haidin, B', PaPi6, P., Sorajii, S. and l{jaji6, Z' (2008) Sustainable DeveloPment of Hungarian-S erbian Transboundary Aquifer (SUDEHSTRA), Finai Report, Fac. Min. Geol. UniversitY of Belgtade, Belgrade. 10 Institute of Water Management "]aroslav eerni" (2004) Altemative Solulions in Water Suppl ...Zoran Stevanović, Peter Kozák, Milojko Lazić, Janos Szanyi, Dušan Polomčić, Balazs Kovács, Jozsef Török, Saša Milanović, Bojan Hajdin, Petar Papić. "Towards Sustainable Management of Transboundary Hungarian-Serbian Aquifer" in Transboundary Water Resources Management - A Multidisciplinary Approach, Weinheim, Germany : Wiley-VCH (2011): 143-149
-
Application of Project Management Process on Environmental Management System Improvement in Mining-Energy Complexes
... execution has been established within the defined project management activities (Table 5). The defined activities form the basis for the realization of management program by applying the MS Project software package. Figure 3 gives an order of execution of the project activities to improve the environmental protection ...
... the project to improve the environmental protection system in mining and energy complexes. Figure 8. Illustrative part of the network plan of the branched project structure to improve the environmental protection system in mining and energy complexes. The final phase of the management project, based ...
... development [4]. The concept of sustainable development of the environment and society was popularized in the Brundtland Report when it was published in 1987 [5]. In this report, sustainable social activities are defined as those that meet the needs of present generations without compromising the ability ...Jelena Malenović Nikolić, Dejan Vasović , Ivana Filipović , Stevan Mušicki, Ivica Ristović . "Application of Project Management Process on Environmental Management System Improvement in Mining-Energy Complexes" in Energies (2016). https://doi.org/https://doi.org/10.3390/en9121071
-
From post-disaster landslides inventory to open landslides data
Biljana Abolmasov, Miloš Marjanović, Uroš Đurić, Jelka Krušić. "From post-disaster landslides inventory to open landslides data" in Proceedings of 3rd European Regional Conference of IAEG/ Athens/ Greece/ 6-10 October 2021, International Association for Engineering Geology and the Environment (2021)
-
A WebGIS Decision Support System for Management of Abandoned Mines
Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis (2016)... ication_MR_v3.0rc3.pdf (accessed on 11 April 2015). 20. The Interagency Appalachian Coal Mining Geographic Information System (GeoMine) Pilot Project Report. Available online: http://www.tips.osmre.gov/Geospatial/GEOMINE/FinalReport.pdf (accessed on 11 April 2015). 21. Office of Surface Mining R ...
... the EU environmental acquis. The project “Cadastre of Abandoned Mines in the Autonomous Province of Vojvodina” is singled out as the key project of reference in the procurement procedure for this new project. Hence the Energies 2016, 9, 567 11 of 14 new project will have to be closely linked and ...
... development of Serbia [5]. 2. Results The “Cadastre of Abandoned Mines in the Territory of AP Vojvodina” project was developed at Faculty of Mining and Geology, University of Belgrade. The project activities preformed within the development of the cadastre of abandoned mines in Vojvodina and the ac ...Ranka Stanković, Nikola Vulović, Nikola Lilić, Ivan Obradović, Radule Tošović, Milica Pešić-Georgiadis. "A WebGIS Decision Support System for Management of Abandoned Mines" in Energies 7 no. 9 (2016): 567. https://doi.org/10.3390/en9070567
-
An aproach to Implementation of blended learning in a university setting
... e-learning project (http://elearning.amres.ac.rs/moodle/) aimed at fostering a new approach to instruction at the University of Belgrade through the use of diverse computer and communication technologies. The emphasis in this project was on Moodle, and within the scope of the project, teachers ...
... extremely important. A “Backup Report” gives an overview showing when each course had been archived, and the archive status. For each course the administrators can define the number of most recent copies to be kept by Moodle, and set copies of the backup report to be sent by e-mail. More details ...
... Assignments. Figure 7: Weekly access to various course content Another useful type of report, “Gradebook”, offers and overview of student results for different assignments. Teachers can use this report to analyze student grades for different assignments at the course level. 5. POSTGRADUATE ...Ivan Obradović, Ranka Stanković, Olivera Kitanović, Jelena Prodanović . "An aproach to Implementation of blended learning in a university setting" in Proceedings of the Second International Conference on e-Learning, eLearning 2011, September 2011, Belgrade, Serbia, Belgrade : Belgrade Metropolitan University (2011)
-
Results of Recent Monitoring Activities on Landslide Umka, Belgrade, Serbia—IPL 181
Biljana Abolmasov, Uroš Đurić, Jovan Popović, Marko Pejić, Mileva Samardžić Petrović, Nenad Brodić (2021)... Belgrade, Serbia—IPL 181 Biljana Abolmasov, Uroš Đurić, Jovan Popović, Marko Pejić, Mileva Samardžić Petrović, and Nenad Brodić Abstract Results of recent monitoring activities conducted from 2014 to 2019 are presented in the paper as a part of IPL 181 Project progress report. Recent monitoring ...
... system. The objective of this paper is to present the results of recent monitoring activities conducted from 2014 to 2019 as a part of IPL 181 Project report. Study Area The study area is located on the right bank of the Sava river, 25 km South-west of Belgrade, the capital of Serbia. Extensive ...
... Monitoring � GNSS � Geodetic survey benchmarks � UAV images � PSInSAR Introduction The IPL project No 181 titled “Study of slow moving landslide Umka near Belgrade” started in November 2012. Basic objective of the Project is to enable the analysis, correlation and synthesis of data obtained from various ...Biljana Abolmasov, Uroš Đurić, Jovan Popović, Marko Pejić, Mileva Samardžić Petrović, Nenad Brodić. "Results of Recent Monitoring Activities on Landslide Umka, Belgrade, Serbia—IPL 181" in Understanding and Reducing Landslide Disaster Risk. WLF 2020. ICL Contribution to Landslide Disaster Risk Reduction, Springer, Cham (2021). https://doi.org/10.1007/978-3-030-60196-6_14
-
Legal framework for recultivation of degraded areas caused by mining exploitation
Radmila Gaćina (2023)Prilikom površinske i podzemne eksploatacije uglja eksploatacioni sistemi oštećuju veće ili manje površine zemljišta. Iskustva pokazuju da su oštećenja zemljišta znatno veća kod površinske eksploatacije, gde je prostora degradiran ne samo u konturi rudnika i okoline, već se promene takođe dešavaju u prirodnom okruženju. U članku su predstavljeni rezultati studije zakonskih okvira rekultivacije u nekim zemljama sveta i u Srbiji. Praktično iskustvo rekultivacije pokazalo je da iskorišćenje i devastacija tokom rudarske aktivnosti predstavljaju opasnost ne samo za pogođena ...... environmental impact assessment: challenges and opportunities drawn from African and Australian practice. Impact Assessment and Project Appraisal 34(2):117—128 National Report Available online · https://sustainabledevelopment.un.org/content/docume nts/dsd/dsd_aofw_ni/ni_pdfs/NationalReports/germany/mining ...
... activities in accordance with the reclamation project (Law on Mining and geological research, 101/2015,95/2018, 40/2021). The performance of mining exploitation is conditioned by the existence of prepared and approved investment-technical and project documentation, and the scope of recultivation ...
... rehabilitate the degraded environment in another way. The assessment of the impact of the project on the environment is an integral part of the documentation without which the execution of the project cannot be started, and it is based on the preparation of the Study on the assessment of the ...Radmila Gaćina. "Legal framework for recultivation of degraded areas caused by mining exploitation" in Underground mining engineering, Belgrade : University of Belgrade - Faculty of Mining and Geology (2023). https://doi.org/10.5937/podrad2342027G
-
Business Models for Small-scale Biomass Projects Development
Biomass is recognized as the most promising renewable energy source in Serbia. The share of biomass in Serbian final energy consumption is over 10%, but mostly related to traditional use in stoves and ovens. One of the main obstacles for wider implementation of contemporary biomass facilities is the inexperience of consumers and stakeholders in the implementation of “innovative” business models, especially in the cases of small-scale projects. In this paper, three different business models (public utility company, energy cooperative ...... 645, 2019. [3] Horizon 2020 project, Bioenergy Villages (BioVill) – Increasing the Market Uptake of Sustainable Bioenergy, grant agreement No 691661, available at http://www.biovill.eu/ [4] Jerotić, S., D. Ivezić, M. Gluščević, H. Tretter, S. Athavale, M. Höher, Report on the opportunities to set ...
... practice that could be replicated. Into the framework of H2020 BioVill project [3] an attempt for development of small-scale biomass project in the village of Kostojevići (in the municipality of Bajina Bašta) was done. The project aim was the promotion of the concept of “bioenergy village”, that is an ...
... Biovill project [procesna tehnika, Brisel] was used in this paper to propose three different business models (public utility company, energy cooperative and public-private partnership according to ESCO model) for development of the project in Kostojevići, but also to be used for a similar project in other ...Dejan Ivezić, Miodrag Gluščević, Marija Živković. "Business Models for Small-scale Biomass Projects Development" in 19th International Conference on Thermal Science and Engineering of Serbia, Niš : Faculty of Mechanical Engineering (2019)
-
FrameNet Lexical Database: Presenting a Few Frames Within the Risk Domain
U radu se daje kratak prikaz teorije semantike okvira, na kojoj je zasnovana leksička baza Frejmnet. Predstavljena je koncepcija ove mreže, kao i mogućnosti njene primene. Predstavljena je i leksička analiza koja se primenjuje u projektu izrade Frejmneta i ukazano na razlike između analize zasnovane na okviru u odnosu na analizu zasnovanu na reči. Zatim je prikazano nekoliko povezanih okvira koje prizivaju reči iz domena rizika. U radu je predstavljena i platforma NLTК pomoću koje se mogu koristiti ...... There are two types of reports in the form of dynamic web-pages (LexUnit Report and Lex- ical Entry Report) which are automatically generated after the annotation is finished and are available on the FrameNet website. The first report shows all the annotated sentences for an LU. Moreover, all the elements ...
... the theoretical basis of the Berkeley FrameNet project. We present the basic con- cepts of this database, as well as the possibility of implementing it in Serbian. We also take a close look at the lexical analysis used in the FrameNet development project and point out the differences between the frame-based ...
... Word Risk in a Mining-related Corpus The development of a monolingual corpus in the domain of mining started as part of a mining project documentation management project using language 18. Data for the frame Risky_situation 22 Infotheca Vol. 21, No. 1, September 2021 Scientific paper technologies ...Aleksandra Marković, Ranka Stanković, Natalija Tomić, Olivera Kitanović. "FrameNet Lexical Database: Presenting a Few Frames Within the Risk Domain" in Infotheca, Faculty of Philology, University of Belgrade (2021). https://doi.org/10.18485/infotheca.2021.21.1.1
-
Improving Document Retrieval in Large Domain Specific Textual Databases Using Lexical Resources
Large collections of textual documents represent an example of big data that requires the solution of three basic problems: the representation of documents, the representation of information needs and the matching of the two representations. This paper outlines the introduction of document indexing as a possible solution to document representation. Documents within a large textual database developed for geological projects in the Republic of Serbia for many years were indexed using methods developed within digital humanities: bag-of-words and named ...... Republic of Serbia from 1956 to the present day.2 For each project a structured description is avail- able in the form of a project summary containing the following metadata: title, year, project location, company that developed the project, authors, abstract, keywords, geological field, prospects, ...
... prospective exploration. Each project summary also contains approximately 30% of the content of the projects itself, obtained basically by removing pictures, maps, tables, and the like, offering thus a reasonably accurate representation of the textual content of the geological project. Future plans include ...
... = δ = 0 and γ = 0.6. Indexing is performed in the following steps: 1. Generating a text (Di) from records and fields of the project summary related to a particular project document, where i = 1, . . . N and N is the size of the document collection; 2. Lemmatizing and POS tagging of all Di texts; 3 ...Ranka Stanković, Cvetana Krstev, Ivan Obradović, Olivera Kitanović. "Improving Document Retrieval in Large Domain Specific Textual Databases Using Lexical Resources" in Trans. Computational Collective Intelligence - Lecture Notes in Computer Science 26, Springer (2017). https://doi.org/10.1007/978-3-319-59268-8_8
-
Improvement of geodatabase queries within GeolISS
Ranka Stanković (2008)... National Geologic Map Database, in Soller, David R., ed., Digital Mapping Techniques ‘03— Workshop Proceedings, U. S. Geological Survey Open-File Report 03-471, p. 157–167. http://pubs.usgs.gov/of/2003/of03-471/richard1/index. [2] Richard, S.M., 2003. Geologic map database implementation in the ...
... the ESRI Geodatabase environment, in Soller, D.R., ed.,Digital Mapping Techniques 03—Workshop Proceedings, U.S. Geological Survey Open-File Report 03-471, p.169–183, accessed at http://pubs.usgs.gov/of/2003/of03-471/richard2/ [3] GeoSciML interchange scheme from CGI, IUGS (https://www.seegrid.csiro ...
... field data, Intranet and Internet publishing of geologic information. The Faculty of Mining and Geology of Belgrade University realized the GeolISS project financed by the Ministry of Environmental protection during the period 2004–2006, and from that time many institutions working with geologic data ...Ranka Stanković. "Improvement of geodatabase queries within GeolISS" in Review of the National Center for Digitization, Beograd : Faculty of Mathematics, Belgrade (2008)
-
LRMI markup of OER content within the BAEKTEL project
... of OER content within the BAEKTEL project Ranka Stanković, Daniela Carlucci, Olivera Kitanović, Nikola Vulović, Bojan Zlatić Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] LRMI markup of OER content within the BAEKTEL project | Ranka Stanković, Daniela Carlucci ...
... in Technology Enhanced Learning, http://www.baektel.eu) project. The main motive for implementation of LRMI is to help students and teachers quickly find relevant educational content via regular search engine. Within the BAETEL project we have developed a metadata portal as the metadata and ...
... times of day it was used, how long the learning took, how many times it was accessed etc. In BAEKTEL project paradata are gathered by Google analytics. 5. EDX ARHITECTURE For BAEKTEL project Open edX is used as a web-based platform for creating, delivering, and analyzing online courses. Figure ...Ranka Stanković, Daniela Carlucci, Olivera Kitanović, Nikola Vulović, Bojan Zlatić. "LRMI markup of OER content within the BAEKTEL project" in The Sixth International Conference on e-Learning (eLearning-2015), September 2015, Belgrade, Serbia, Belgrade : Belgrade Metropolitan Univesity (2015)
-
Towards translation of educational resources using GIZA++
... providers. [2] TraMOOC (Translation for Massive Open Online Courses) is a Horizon 2020 collaborative project aiming at providing reliable machine Translation for MOOCs. The main result of the project will be an online translation platform, which will utilize a wide set of linguistic infrastructure ...
... alignment on the word level were performed also on the Intera English/Serbian corpus [19, 20] with and without lemmatisation and PoS tagging. Authors report the most suitable measure: ranky(x) = (C(x|y) / ΣiϵV C(i|y)) * (C(x|y) / C(x) ) where V is the set of word forms i of a target language for which ...
... Cambridge Scholars Publishing,. ISBN (13) 978-1-4438-3878-8, 2012. [21] A. Obuljen, Kvantitativna metoda za poravnanje dvojezičnog korpusa. Internal report, Faculty of Mathematics, University of Belgrade, Serbia, 2009. View publication statsView publication stats https://www.class-central.com/ ...Ivan Obradović, Dalibor Vorkapić, Ranka Stanković, Nikola Vulović, Miladin Kotorčević. "Towards translation of educational resources using GIZA++" in The Seventh International Conference on e-Learning (eLearning-2016), September 2016, Belgrade : Metropolitan Univesity (2016)
-
Srbija u OneGeology Europe
Геолошки завод Србије као носилац Пројекта ОneGeologyEurope заједно са Рударско геолошким факултетом и Министарством за природне ресурсе, рударство и просторно планирање су се укључили у међународни Пројекат OneGeology Europe у мају 2013. године у већ поодмаклој фази израде Пројекта. До краја 2013. године испунили су завршене активности које треба да доведу до пуноправног укључења у Пројекат чиме је Република Србија нашла своје место на Геолошкој карти Европе 1:1М. Геолошка карта Србије 1:1М представља компилациону односно поједностављену верзију ОГК 1:500 ...... Serbia, as the carrier of OneGeology Europe Project together with the Faculty of Mining and Geology and the Ministry of Natural Resources, Mining and Spatial Planning, have joined the international Project OneGeology Europe in May, 2013, while the project development had already been at an advanced ...
... Serbia, as the carrier of OneGeology Europe Project together with the Faculty of Mining and Geology and the Ministry of Natural Resources, Mining and Spatial Planning, have joined the international Project OneGeology Europe in May, 2013, while the project development had already been at an advanced stage ...
... in the Project shall have been fulfilled, when Serbia will have found its place on the geological map of Europe 1:1 M. Geological map of Serbia 1:1 M represents a simplified version of a geological map 1:500,000, made according to the standards described in the OneGeology Europe Project. Several ...Danka Blagojević, Ranka Stanković, Petar Stejić, Velizar Nikolić. "Srbija u OneGeology Europe" in Zapisnici Srpskog geološkog društva za 2013. godinu, Beograd : Srpsko geološko društvo (2014)