Претрага
594 items
-
Novel cerium and praseodymium doped phosphate tungsten bronzes: Synthesis, characterization, the behavior in the Briggs-Rauscher reaction and photoluminescence properties
Tijana Maksimović, Pavle Tančić, Jelena Maksimović, Dimitrije Mara, Marija Ilić, Rik Van Deun, Ljubinka Joksović, Maja Pagnacco (2023)Due to the interesting and potentially useful properties, phosphate tungsten bronzes are constantly being studied and attract a lot of attention. In the present work, two different metallic elements, belonging to the group of rare-earth metals, cerium and praseodymium, were used as a dopants for phosphate tungsten bronzes. Novel cerium and praseodymium doped phosphate tungsten bronzes were successfully synthesized and further characterized by thermal analyses, Fourier-transform infrared spectroscopy, X-ray powder diffraction, scanning electron microscopy with energy-dispersive X-ray spectrometer and ...Electrical and Electronic Engineering, Atomic and Molecular Physics and Optics, Electronic, Optical and Magnetic Materials, Inorganic Chemistry, Organic Chemistry, Physical and Theoretical Chemistry, SpectroscopyTijana Maksimović, Pavle Tančić, Jelena Maksimović, Dimitrije Mara, Marija Ilić, Rik Van Deun, Ljubinka Joksović, Maja Pagnacco. "Novel cerium and praseodymium doped phosphate tungsten bronzes: Synthesis, characterization, the behavior in the Briggs-Rauscher reaction and photoluminescence properties" in Optical Materials, Elsevier BV (2023). https://doi.org/10.1016/j.optmat.2023.114125
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
Developing Students’ Mining and Geology Vocabulary Through Flashcards and L1 in the CLIL Classroom
... s environments such as Serbia, where the majority are monolingual and where most of the students are at low levels of English. Therefore, our general approach is to mix the L1 with the target language in order to clarify the meaning, to correspond the new words with the words they already know ...
... functions of and within the words, providing the students the opportunity to see the lexis in action, to strengthen connections, and to widen their general lexical knowledge. 4 3 3 3 3 3 2 5 4 2 25 28 15 27 24 26 24 26 30 28 35 36 44 29 36 0 10 20 30 40 50 60 70 80 90 100 I ...
... Conference on Teaching English for Specific Purposes and New Language Learning Technologies, May, 22-24, 2015, Niš, Serbia, Faculty of Electronic Engineering, University of Niš | 2015 | | http://dr.rgf.bg.ac.rs/s/repo/item/0001754 Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду ...Lidija Beko, Ivan Obradović, Ranka Stanković. "Developing Students’ Mining and Geology Vocabulary Through Flashcards and L1 in the CLIL Classroom" in Proceedings of the Second International Conference on Teaching English for Specific Purposes and New Language Learning Technologies, May, 22-24, 2015, Niš, Serbia, Faculty of Electronic Engineering, University of Niš, Niš : Faculty of Electronic Engineering (2015)
-
Compaction of Municipal Solid Waste
Jovana Janković Pantic, Dragoslav Rakić, Tina Đurić, Irena Basarić Ikodinović, Snežana Bogdanović (2022)Regardless of the numerous activities undertaken to reduce municipal solid waste, its annual volumes continue to grow. In Serbia, the most common and the only one form of waste disposal is at municipal landfills with daily compaction and soil covering. Municipal waste compacting is one of the basic components of the disposal process. Well compacted waste takes up less volume and allows much safer storage. In order to better predict the behavior of municipal waste at landfills, it is ...Jovana Janković Pantic, Dragoslav Rakić, Tina Đurić, Irena Basarić Ikodinović, Snežana Bogdanović. "Compaction of Municipal Solid Waste" in ICEG 2022: International Conference on Environmental Geotechnics, World Academy of Science, Engineering and Technology (2022)
-
Climate change and their imapct on karst groundwater
Milan Đelić, Vesna Ristić Vakanjac (2021)In the last 30 years, there have been progressively more dry and rainy years, a reduced presence or even absence of snow cover, an increase in air temperature, large-scale fires, intensified glacier melting, and the like. Climate change certainly has an effect on all areas of economic activity, but its largest impact is on water resources and existing ecosystems. One of the most important water resources is groundwater, on account of which more than 70% of the population of ...Milan Đelić, Vesna Ristić Vakanjac . "Climate change and their imapct on karst groundwater" in Book of proceedings of the 3rd International Scientific Conference on vircular and bioeconomy CIBEK2021, Belgrade, Belgrade : School of Engineering Management (2021)
-
A Fuzzy Expert Model for Availability Evaluation
Each technical system within itself carries the great potential danger of possible occurrence of failure and damages. Mining machines are characteristic by great investment values, costs of unplanned shutdowns, complex working conditions, and environment and workers hazards. Systematic monitoring of the mining machinery is of great importance for the management of the mining companies. Availability is the overall concept of quality of service. Includes information regard to operating state, an idle state, a standby state and shut down. The ...... the working environment. Availability is an integral and important component of life cycle management for numerous engineering systems. This is quite a familiar term in engineering communication. This article described an expert’s system for availability evaluation and model for availability calculation ...
... be implemented to other engineering systems or products. REFERENCES [1] Tanasijević M., Ivezić D., Jovančić P., Ćatić D., Zlatanović D., Study of Dependability Evaluation for Multi-hierarchical Systems Based on Max–Min Composition, Quality and Reliability Engineering International, 29(3), 317-326 ...
... fuzzy sets to safety and reliability engineering, International Journal of Approximate Reasoning, Vol. 100, Pages 29-55, 2018. [8] Wang, J., Yang, J.B., Sen, P. Safety analyses and synthesis using fuzzy sets and evidential reasoning. Reliability Engineering and System Safety, 47(2), 103-118, 1995 ...Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić. "A Fuzzy Expert Model for Availability Evaluation" in Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), AGH University of Science and Technology, Kraków - Wieliczka, Poland (2019)
-
Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were de-fined as a part of the General Metro Construction Project. The lines are de-signed to intersect at the location of Sava Square, where an interchange met-ro station will be built. It represents a complex geotechnical structure consist-ing of three different ...Nemanja Stanic, Dragoslav Rakic, Josip Isek, Slavoljub Simic. "Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One" in Lecture Notes in Civil Engineering, Springer Nature Singapore (2024). https://doi.org/10.1007/978-981-97-8221-5_11
-
Results of comprehensive monitoring activities on Umka landslide, Belgrade, Serbia
Biljana Abolmasov, Uroš Đurić (2021)... SAROGLOU N. DEPOUNTIS G. PAPATHANASSIOU 3% EUROPEAN REGIONAL CONFERENCE OF THE INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY & THE ENVIRONMENT Leading to Innovative Engineering Geology Practices VOLUME 1 Extended Abstracts Proceedings Organised by the National Group of Greece of IAEG ...
... Đurić2 1University of Belgrade, Faculty of Mining and Geology, Serbia, biljana.abolmasov@rgf.bg.ac.rs 2University of Belgrade, Faculty of Civil Engineering, Serbia, udjuric@grf.bg.ac.rs Background The Umka landslide is the deepest and biggest active landslide in the Republic of Serbia and has ...Biljana Abolmasov, Uroš Đurić . "Results of comprehensive monitoring activities on Umka landslide, Belgrade, Serbia" in 3rd European Regional Conference of IAEG/ Athens/ Greece/ 6-10 October 2021, IAEG National Group Greece (2021)
-
Permanent GNSS monitoring of landslide Umka
Mileva Samardžić Petrović, Jovan Popović, Uroš Đurić, Biljana Abolmasov, Marko Pejić, Miloš Marjanović (2020)Клизиште Умка је једно од највећих насељених активних клизишта у Србији. Активност клизишта Умка се прати већ више од 85 година, различитим геотехничким и геодетским техникама. Од 2010. године, активност kлизишта се континуирано прати у реалном времену аутоматизованим перманентним системом за праћење базираним на Глобалним навигационим сателитским системима (ГНСС). Поред тога, од 2018. године активност клизишта се додатно прати кинематичким ГНСС одређивањем положаја скупа карактеристичних тачака као и применом UAV фотограметрије. Главни циљ овог рада је приказ резултата опажања три ...... Samardžić-Petrović, mimas@grf.bg.ac.rs, Faculty of Civil Engineering, University of Belgrade Jovan Popović, popovic@grf.bg.ac.rs, Faculty of Civil Engineering, University of Belgrade Uroš Đurić, udjuric@grf.bg.ac.rs, Faculty of Civil Engineering, University of Belgrade Biljana Abolmasov, biljana ...
... of almost ten years of permanent monitoring, the system was successfully used in order to track the dynamics of Umka landslide in real time. In general, the derived data of automated monitoring are analyzed for two time periods separately, due to the relocation of the object point on December 2013 ...
... After the analysis of the dynamics of the Umka landslide, it is concluded that the third observation epoch should be realized in April 2020. In general, each of these applied procedures, automated GNSS monitoring, GNSS monitoring of characteristic landslide points and UAV photogrammetry, has an important ...Mileva Samardžić Petrović, Jovan Popović, Uroš Đurić, Biljana Abolmasov, Marko Pejić, Miloš Marjanović. "Permanent GNSS monitoring of landslide Umka" in International Conference on Contemporary Theory and Practice in Construction XIV Stepgrad, University of Banja Luka, Faculty of Architecture, Civil Engineering and Geodesy (2020). https://doi.org/10.7251/STP2014091S
-
Хазард од клизишта у Србији у 21. веку
Biljana Abolmasov (2019)... scales. Engineering Geology 102: 164 177. Corominas J., van Westen, Frattini P., Cascini L., Malet JP., Foto Van Den Eechaut M., Mavrouli O., Agliardi F., Pitikalis K., Winte Ferlisi S., Tofani V., Hervas J., Smith JT. (2014). Recommendations analysis of landslide risk. Bulleting of Engineering Geology ...
... Natural Hazards 3. UNESCO Press, Paris. 63 pp. [9] Aleotti P., Chowdhury R. (1999). Landslide hazard assessment:summar new perspectives. Bulletin of Engineering Geology and the Environm [10] Guzzetti F, Carrara A, Cardinalli M, Reichenbach P. (1999). Lan evaluation: a review of current techniques and their ...
... Natural Hazards 3. UNESCO Press, Paris. 63 pp. Aleotti P., Chowdhury R. (1999). Landslide hazard assessment: summa new perspectives. Bulletin of Engineering Geology and the Environ Guzzetti F, Carrara A, Cardinalli M, Reichenbach P. (1999). Lal evaluation: a review of current techniques and their applicatior ...Biljana Abolmasov. "Хазард од клизишта у Србији у 21. веку" in Геохазард у Србији у 21. веку – знање је најбољи бедем против стихије, Српска академија наука и уметности (2019)
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... 24 October 2019 ���������� ������� Abstract: Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process ...
... Published: 24 October 2019 updates Abstract: Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process ...
... state picture, i.e., the time and maintenance time structure for analyzing the availability of technical systems is shown in Figure 1, where, in general, t1 is uptime, and t2 is downtime. The time when the system is in its proper state can be divided into inactive time or the standby time (t11) and the ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
Machine learning based landslide assessment of the Belgrade metropolitan area: Pixel resolution effects and a cross-scaling concept
Improvements of Machine Learning-based landslide prediction models can be made by optimizing scale, customizing training samples to provide sets with the best examples, feature selection, etc. Herein, a novel approach, named Cross-Scaling, is proposed that includes the mixing of training and testing set resolutions. Hypothetically, training on a coarser resolution dataset and testing the model on a finer resolution should help the algorithm to better generalize ambiguous examples of landslide classes and yield fewer over/underestimations in the model. This ...Uroš Đurić, Miloš Marjanović, Zoran Radić, Biljana Abolmasov. " Machine learning based landslide assessment of the Belgrade metropolitan area: Pixel resolution effects and a cross-scaling concept" in Engineering Geology , Elsevier (2019). https://doi.org/10.1016/j.enggeo.2019.05.007
-
Model inteligentnog sistema adaptivnog upravljanja procesom prerade rude
Ivana M. Jovanović (2016-01-13)U oblasti procesa prerade rude, flotacijska koncentracija predstavlja jednu od najznačajnijih i najčešće primenjivanih metoda separacije korisnih od nekorisnih minerala. Samim tim, veoma je važno osigurati uspešan rad flotacijskog postrojenja kroz dostizanje zadovoljavajućih tehno-ekonomskih pokazatelja. Cilj upravljanja procesom flotacijske koncentracije je upravo optimizacija kvaliteta i iskorišćenja korisne komponente u koncentratu uz maksimizaciju profita. Shodno tome, istraživanja na polju modelovanja i upravljanja ovim procesom zauzimaju značajno mesto u praksi kontolnog inženjenringa.Teorijska istraživanja u okviru doktorske disertacije obuhvatila su analizu položaja ...flotacijska koncentracija, modelovanje, upravljanje, inteligentni sistem, soft kompjuting, fazi logika, veštačke neuronske mreže... Mining Engineering, Vol. 18, pp. 53-57. 67. Ferreira, J. P., Loveday, B. K., 2000. An improved model for simulation of flotation circuits. Minerals Engineering 13 (14-15), pp. 1441–1453. 68. Fichera, M.A., Chudacek, M.W., 1992. Batch cell flotation models - A review. Minerals Engineering, Vol. 5 ...
... control, intelligent system, soft computing, fuzzy logic, artificial neural networks Scientific area: MINING ENGINEERING Narrow scientific area: COMPUTING AND SYSTEM ENGINEERING UDC: 004.81-1:005.1/.3/.5/.7:311 519.237/.245 621.31:622:681.3 658.5:659.2(043.3) ...
... processes with self-organizing neural nets. Chemical Engineering Communications 139 (1), pp. 25–39 4. Aldrich, C., Moolman, D.W., Gouws, F.S., Schmitz, G.P.J., 1997. Machine learning strategies for control of flotation plants. Control Engineering Practice, Vol. 5, No. 2, pp. 263–269 5. Aldrich, C ...Ivana M. Jovanović. "Model inteligentnog sistema adaptivnog upravljanja procesom prerade rude" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2016-01-13)
-
Agent-based modeling as a support to an expert-based approach: Exploring individual heating systems transition
Expert-based energy scenarios are mainly developed following assumptions of experts and, in most cases, a limited number of stakeholders. Such an approach will provide satisfactory results in centrally managed energy sectors where further decisions could be envisaged relatively precisely (electricity production/distribution, district heating systems, etc.). The same approach will provide more uncertain outcomes of future energy structure in the household sector, where decisions related to consumption, selection of energy source, or application of specific technology are made by numerous ...Energetska tranzicija, Grejanje domaćinstava, Individualni sistemi grejanja, Energetsko planiranje, Integrisano energetsko planiranje, ABM, LEAP, SrbijaBoban Pavlović, Marija Živković, Dejan Ivezić. "Agent-based modeling as a support to an expert-based approach: Exploring individual heating systems transition" in South East European Conference on Sustainable Development of Energy, Water and Environment Systems 22 – 26 May 2022, Vlorë, Albania, Faculty of Mechanical Engineering and Naval Architecture, Zagreb (2022)
-
Two approaches to compilation of bilingual multi-word terminology lists from lexical resources
In this paper, we present two approaches and the implemented system for bilingual terminology extraction that rely on an aligned bilingual domain corpus, a terminology extractor for a target language, and a tool for chunk alignment. The two approaches differ in the way terminology for the source language is obtained: the first relies on an existing domain terminology lexicon, while the second one uses a term extraction tool. For both approaches, four experiments were performed with two parameters being ...Branislava Šandrih, Cvetana Krstev, Ranka Stanković. "Two approaches to compilation of bilingual multi-word terminology lists from lexical resources" in Natural Language Engineering, Cambridge University Press (CUP) (2020). https://doi.org/10.1017/S1351324919000615
-
Numerical modeling of Selanac debris flow propagation using SPH code
The Selanac debris flow is a very huge event triggered after extreme rainfall caused by Cyclone Tamara activity in the Republic of Serbia in May 2014. The Selanac case study was already modelling in different programs using Voellmy rheology assumptions like RAMMS software. In this paper research are focusing particularly on the process of debris flowing from initiation zone to main deposition area using Geoflow SPH two-phase model considering frictional rheology law. Main rheological parameters are back-calculated using also ...... dr.rgf.bg.ac.rs INTERNATIONAL SOCIETY FOR SOIL MECHANICS AND GEOTECHNICAL ENGINEERING This paper was downloaded from the Online Library of the International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE). The library is available here: https://www.issmge.org/publication ...
... best-fitted parameter was 1000 m/s 2 . The amount of entrainment material was included and calculated using Hungr approach. Apart from detail engineering geological mapping of debris flow, Electrical Resistivity Tomography (ERT) are used for validation of models, since depths and dimension of occurrence ...Jelka Krušić, Biljana Abolmasov, Miloš Marjanović, Manuel Pastor, Saeid M. Tayyebi . "Numerical modeling of Selanac debris flow propagation using SPH code" in SCG-XIII International Symposium on Landslides. Cartagena, Colombia- February 22-26, 2021, International Society for Soil Mechanics And Geotechnical Engineering (2021)
-
Preliminary regional landslide susceptibility assessment using limited data
Igor Peshevski, Milorad Jovanovski, Biljana Abolmasov, Jovan Papic, Uroš Đurić, Miloš Marjanović, Ubydul Haque, Natasha Nedelkovska (2019)In this paper a heuristic approach for preliminary regional landslide susceptibility assessment using limited amount of data is presented. It is called arbitrary polynomial method and takes into account 5 landslide conditioning parameters: lithology, slope inclination, average annual rainfall, land use and maximum expected seismic intensity. According to the method, in the first stage, a gradation is performed for each of the carefully selected conditioning parameters by assigning so called rating points to the grid cells on which the ...... Methodius, Faculty of Civil Engineering, Blvd. Partizanski odredi No.24, 1000 Skopje, Republic of Macedonia; (pesevski@gf.ukim.edu.mk) 2 University of Belgrade, Faculty of Mining and Geology, Đušina 7, 11000 Belgrade, Serbia 3 University of Belgrade, Faculty of Civil Engineering, Bulevar Kralja Aleksandra ...
... Macedonia were considered. After analysis of all the available thematic geological, engineering geological, geotechnical maps and cross-sections, and geotechnical reports, lithological units were grouped into six engineering-geological groups with simi- lar physical-mechanical behavior. The rating values ...
... Doctoral thesis.− Faculty of Civil Engineering, Skopje, 181 p. PESHEVSKI, I., JOVANOVSKI, M., PAPIC, BR. J. & JOVICIC, L. (2015b): Prep- aration of landslide susceptibility maps using GIS, recent case study in R. Macedo- nia.– Scientific Journal of Civil Engineering, 4/1, 47–53. PESHEVSKI, I., PETERNEL ...Igor Peshevski, Milorad Jovanovski, Biljana Abolmasov, Jovan Papic, Uroš Đurić, Miloš Marjanović, Ubydul Haque, Natasha Nedelkovska. "Preliminary regional landslide susceptibility assessment using limited data" in Geologica Croatica , Croatian Geological Society (2019). https://doi.org/10.4154/gc.2019.03
-
Extensive vibrations of the belt conveyer drive electromotor of a bucket wheel excavator as a result of intesified wear-and-tear of its mount support
Vesna Damnjanović, Predrag Jovančić, Snežana Aleksandrović. "Extensive vibrations of the belt conveyer drive electromotor of a bucket wheel excavator as a result of intesified wear-and-tear of its mount support" in Journal of Vibroengineering (2017). https://doi.org/10.21595/jve.2016.17321
-
GNSS Time Series as a Tool for Seismic Activity Analysis Related to Infrastructure Utilities
Sanja Tucikešić, Ankica Milinković, Branko Božić, Ivana Vasiljević, Mladen Slijepčević . "GNSS Time Series as a Tool for Seismic Activity Analysis Related to Infrastructure Utilities" in Contributions to International Conferences on Engineering Surveying. Springer Proceedings in Earth and Environmental Sciences, Dubrovnik, Croatia, October 22-23, 2020, Springer, Cham (2021). https://doi.org/10.1007/978-3-030-51953-7_21
-
Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine
Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić (2021)The production of lignite in large open-pit mines is mainly performed with continuously operating equipment, where bucket-wheel excavators, bucket-chain excavators, belt conveyors, and spreaders are the basic machines. Smaller machines, usually of discontinuous operating nature, are commonly categorized as auxiliary machines. This paper presents the research related to the analysis of auxiliary machine parameters with the case study for a hydraulic excavator. The purpose of the analysis was to develop a model of rating quality of service of the ...Stevan Đenadić, Miloš Tanasijević, Vladimir Milisavljević, Dragan Ignjatović, Predrag Jovančić. "Application of the Fuzzy Model in the Evaluation and Selection of Hydraulic Excavators on Open-Pit Lignite Mine" in SSRN Electronic Journal, Elsevier BV (2021). https://doi.org/10.2139/ssrn.3945617