Претрага
2385 items
-
Dispersion Modeling of Particulate Matter in Surface Lead and Zinc Mine Šuplja Stijena
Nikola Lilić, Vladimir Milisavljević, Uroš Pantelić, Ljiljana Kolonja, Dragan Medenica. "Dispersion Modeling of Particulate Matter in Surface Lead and Zinc Mine Šuplja Stijena" in Mining and Environmental Protection, 5th International Symposium, Beograd:Rudarsko-geološki fakultet, Center for Environmental Engineering (2015): 366-375
-
Novel cerium and praseodymium doped phosphate tungsten bronzes: Synthesis, characterization, the behavior in the Briggs-Rauscher reaction and photoluminescence properties
Tijana Maksimović, Pavle Tančić, Jelena Maksimović, Dimitrije Mara, Marija Ilić, Rik Van Deun, Ljubinka Joksović, Maja Pagnacco (2023)Due to the interesting and potentially useful properties, phosphate tungsten bronzes are constantly being studied and attract a lot of attention. In the present work, two different metallic elements, belonging to the group of rare-earth metals, cerium and praseodymium, were used as a dopants for phosphate tungsten bronzes. Novel cerium and praseodymium doped phosphate tungsten bronzes were successfully synthesized and further characterized by thermal analyses, Fourier-transform infrared spectroscopy, X-ray powder diffraction, scanning electron microscopy with energy-dispersive X-ray spectrometer and ...Electrical and Electronic Engineering, Atomic and Molecular Physics and Optics, Electronic, Optical and Magnetic Materials, Inorganic Chemistry, Organic Chemistry, Physical and Theoretical Chemistry, SpectroscopyTijana Maksimović, Pavle Tančić, Jelena Maksimović, Dimitrije Mara, Marija Ilić, Rik Van Deun, Ljubinka Joksović, Maja Pagnacco. "Novel cerium and praseodymium doped phosphate tungsten bronzes: Synthesis, characterization, the behavior in the Briggs-Rauscher reaction and photoluminescence properties" in Optical Materials, Elsevier BV (2023). https://doi.org/10.1016/j.optmat.2023.114125
-
Rationalization of electrical energy consumption in mining plants
Aleksandrović Snežana, Jovančić Predrag, Jeftenić Ilija. "Rationalization of electrical energy consumption in mining plants" in 6th International Symposium Mining and Environmental Protection MEP 2017, Vrdnik, Serbia:Center for Environmental Engineering, Mining Department, Faculty of Mining and Geology, University of Belgrade (2017): 144-148
-
Assumptions for Definition of Mine Assesments Procedure with Hybrid Model
Zlatanović Dragan, Milisavljević Vladimir, Tanasijević Miloš. "Assumptions for Definition of Mine Assesments Procedure with Hybrid Model" in Mining and Metallurgy Engineering Bor no. 4, Bor:Mining and Metallurgy Institute (2013): 49-58. https://doi.org/10.5937/MMEB1304049Z
-
Assumptions for Defining the Mine Assessment Procedure with Hybrid Model
Dragan Zlatanović, Milisavljević Vladimir, Tanasijević Miloš. "Assumptions for Defining the Mine Assessment Procedure with Hybrid Model" in Mining and Metalurgy Engineering Bor no. 4, Bor:Mining and Metallurgy Institute, Bor (2013): 49-68
-
Forecasting financial distress of mining companies: Tool for examination of key performance indicators
Zlatanović Dragan, Bugarin Mile, Milisavljević Vladimir. "Forecasting financial distress of mining companies: Tool for examination of key performance indicators" in Mining and Metalurgy Engineering Bor no. 1, Bor:Mining and Metallurgy Institute, Bor (2016): 73-80. https://doi.org/10.5937/MMEB1601073Z
-
Developing Students’ Mining and Geology Vocabulary Through Flashcards and L1 in the CLIL Classroom
... rs/profesor.php?id=219&lang=sr vocabulary with different techniques and heard them complaining about the difficulty of finding the best and most effective way to adopt demanding academic vocabulary and very challenging and complex engineering terminology. Vocabulary development of Serbian learners of English ...
... Stanković | Proceedings of the Second International Conference on Teaching English for Specific Purposes and New Language Learning Technologies, May, 22-24, 2015, Niš, Serbia, Faculty of Electronic Engineering, University of Niš | 2015 | | http://dr.rgf.bg.ac.rs/s/repo/item/0001754 Дигитални репозиторијум ...
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs The Second International Conference on Teaching English for Specific Purposes Faculty of Electronic Engineering University ...Lidija Beko, Ivan Obradović, Ranka Stanković. "Developing Students’ Mining and Geology Vocabulary Through Flashcards and L1 in the CLIL Classroom" in Proceedings of the Second International Conference on Teaching English for Specific Purposes and New Language Learning Technologies, May, 22-24, 2015, Niš, Serbia, Faculty of Electronic Engineering, University of Niš, Niš : Faculty of Electronic Engineering (2015)
-
Estimation of soil Compaction Parameters Based on the Atterberg Limits
Đoković Ksenija, Rakić Dragoslav, Ljubojev Milenko. "Estimation of soil Compaction Parameters Based on the Atterberg Limits" in Mining and Metallurgy Engineering Bor no. 4, Bor, Srbija: Mining and Metallurgy Institute Bor = Institut za rudarstvo i metalurgiju Bor (2013): 1-8. https://doi.org/10.5937/MMEB1304001D
-
Results of Experimental Installation of Roofbolting System in the Mines
Dragan Zlatanović, Marija Ilić, Vladimir Milisavljević, Dragan Ignjatović. "Results of Experimental Installation of Roofbolting System in the Mines" in Mining and Metalurgy Engineering Bor no. 4, Bor:Mining and Metallurgy Institute, Bor (2014): 65-84. https://doi.org/10.5937/MMEB1404065Z
-
Prediction of surface subsidence for the purpose of mining project of underground exploitation of bauxite ore in the deposit Podbraćan
Milutinović Aleksandar, Ganić Aleksandar, Ganić Meri, Tokalić Rade. "Prediction of surface subsidence for the purpose of mining project of underground exploitation of bauxite ore in the deposit Podbraćan" in VI International Geomechanics Conference 1, Varna, Bulgaria:Scientific and Tehnical Union of Mining, Geology and Metallurgy; Federation of the Scientific Engineering Unions in Bulgaria (2014): 414-421
-
A Fuzzy Expert Model for Availability Evaluation
Each technical system within itself carries the great potential danger of possible occurrence of failure and damages. Mining machines are characteristic by great investment values, costs of unplanned shutdowns, complex working conditions, and environment and workers hazards. Systematic monitoring of the mining machinery is of great importance for the management of the mining companies. Availability is the overall concept of quality of service. Includes information regard to operating state, an idle state, a standby state and shut down. The ...... ns of fuzzy sets to safety and reliability engineering, International Journal of Approximate Reasoning, Vol. 100, Pages 29-55, 2018. [8] Wang, J., Yang, J.B., Sen, P. Safety analyses and synthesis using fuzzy sets and evidential reasoning. Reliability Engineering and System Safety, 47(2), 103-118 ...
... supportability and the other constituent parts of availability are crucial and must be established and optimized for the economic success of selected machine or overall business systems [5]. The most usual consideration of the availability of machines or any other engineering system in a complex ...
... are produced in large batches and it is very important to be selected in accordance with the working environment. Availability is an integral and important component of life cycle management for numerous engineering systems. This is quite a familiar term in engineering communication. This article described ...Dejan Ivezić, Miloš Tanasijević, Predrag Jovančić, Radiša Đurić. "A Fuzzy Expert Model for Availability Evaluation" in Proceedings of the 2019 20th International Carpathian Control Conference (ICCC), AGH University of Science and Technology, Kraków - Wieliczka, Poland (2019)
-
Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
In order to solve serious traffic congestion in Belgrade, a number of studies regarding the Belgrade Metro construction have been carried out since 1973. However, only in 2019, the routes of the future metro lines 1 and 2 were de-fined as a part of the General Metro Construction Project. The lines are de-signed to intersect at the location of Sava Square, where an interchange met-ro station will be built. It represents a complex geotechnical structure consist-ing of three different ...Nemanja Stanic, Dragoslav Rakic, Josip Isek, Slavoljub Simic. "Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One" in Lecture Notes in Civil Engineering, Springer Nature Singapore (2024). https://doi.org/10.1007/978-981-97-8221-5_11
-
Transformer-Based Composite Language Models for Text Evaluation and Classification
Parallel natural language processing systems were previously successfully tested on the tasks of part-of-speech tagging and authorship attribution through mini-language modeling, for which they achieved significantly better results than independent methods in the cases of seven European languages. The aim of this paper is to present the advantages of using composite language models in the processing and evaluation of texts written in arbitrary highly inflective and morphology-rich natural language, particularly Serbian. A perplexity-based dataset, the main asset for the ...Mihailo Škorić, Miloš Utvić, Ranka Stanković. "Transformer-Based Composite Language Models for Text Evaluation and Classification" in Mathematics, MDPI AG (2023). https://doi.org/10.3390/math11224660
-
Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka
Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović (2015)Zlatanović Dragan, Milisavljević Vladimir, Milenko Ljubojev, Dragan Ignjatović, Zoran Stojanović. "Forecasting the Behaviour of the Rock Mass Before Taking Up the Excavation on a Deeper Layers of the Ore Body Borska Reka" in Mining and Metalurgy Engineering Bor no. 2, Bor:Mining and Metallurgy Institute, Bor (2015): 29-52. https://doi.org/10.5937/MMEB1502029Z
-
Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant ‘Djerdap 1’ backwater
P. Pajic, L. Andjelic, U. Urosevic, D. Polomcic. "Evaluation of melioration area damage on the river Danube caused by the hydroelectric power plant ‘Djerdap 1’ backwater" in Water Science and Technology, IWA Publishing (2014). https://doi.org/10.2166/wst.2014.230
-
Permanent GNSS monitoring of landslide Umka
Mileva Samardžić Petrović, Jovan Popović, Uroš Đurić, Biljana Abolmasov, Marko Pejić, Miloš Marjanović (2020)Клизиште Умка је једно од највећих насељених активних клизишта у Србији. Активност клизишта Умка се прати већ више од 85 година, различитим геотехничким и геодетским техникама. Од 2010. године, активност kлизишта се континуирано прати у реалном времену аутоматизованим перманентним системом за праћење базираним на Глобалним навигационим сателитским системима (ГНСС). Поред тога, од 2018. године активност клизишта се додатно прати кинематичким ГНСС одређивањем положаја скупа карактеристичних тачака као и применом UAV фотограметрије. Главни циљ овог рада је приказ резултата опажања три ...... Civil Engineering, University of Belgrade Jovan Popović, popovic@grf.bg.ac.rs, Faculty of Civil Engineering, University of Belgrade Uroš Đurić, udjuric@grf.bg.ac.rs, Faculty of Civil Engineering, University of Belgrade Biljana Abolmasov, biljana.abolmasov@rgf.bg.ac.rs, Faculty of Mining and Geology ...
... of Civil Engineering, Institute of Transportation CIP, The Highway Institute and company Vekom. The detailed descriptions of the technical part and the main characteristics of the established automated GNSS monitoring system can be find in Erić et al. [6]. Generally, the Umka monitoring system consists ...
... Geology, University of Belgrade Marko Pejić, mpejic@grf.bg.ac.rs, Faculty of Civil Engineering, University of Belgrade Miloš Marjanović, milos.marjanovic@rgf.bg.ac.rs, Faculty of Mining and Geology, University of Belgrade PERMANENT GNSS MONITORING OF LANDSLIDE UMKA Abstract: The Umka landslide ...Mileva Samardžić Petrović, Jovan Popović, Uroš Đurić, Biljana Abolmasov, Marko Pejić, Miloš Marjanović. "Permanent GNSS monitoring of landslide Umka" in International Conference on Contemporary Theory and Practice in Construction XIV Stepgrad, University of Banja Luka, Faculty of Architecture, Civil Engineering and Geodesy (2020). https://doi.org/10.7251/STP2014091S
-
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine
Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović (2019)Availability is one of the most used terms in maintainability engineering. This concept is used to denote: The quality of service of an engineering system, i.e., machines, weak points’ analysis, asset management, as well as making decisions in the process of life cycle management. Availability is an overall indicator and contains partial indicators that are oriented towards reliability, maintenance, and logistical support. Availability presents a variable value and changes in time and space. Usually, availability is shown as the ...... of the engineering system, their independent analysis, and ranking, and finally gives the possibility of composition. Structural definitions of each outcome are given in accordance with the work environment. The result has two dimensions, one is the linguistic description of availability and the other ...
... Systems Maintainability and Reliability; The Research Center of Dependability and Quality Management DQM: Prijevor, Serbia, 2007. 2. Dhillon, B.S. Mining Equipment Reliability, Maintainability and Safety; Springer: London, UK, 2008. 3. Todorovic, J. Maintainability Engineering; JUMV: Belgrade, Serbia ...
... Ivan Jankovic 3 and Tomislav Subaranovic 1 1 Faculty of Mining and Geology, University of Belgrade, 11000 Belgrade, Serbia; dragan.ignjatovic@rgf.bg.ac.rs (D.I.); milos.tanasijevic@rgf.bg.ac.rs (M.T.); tomislav.subaranovic@rgf.bg.ac.rs (T.S.) 2 Faculty of Mechanical Engineering, University of Belgrade ...Stevan Đenadić, Dragan Ignjatović, Miloš Tanasijević, Uglješa Bugarić, Ivan Janković, Tomislav Šubaranović. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" in Energies, MDPI AG (2019). https://doi.org/10.3390/en12214044
-
Machine learning based landslide assessment of the Belgrade metropolitan area: Pixel resolution effects and a cross-scaling concept
Improvements of Machine Learning-based landslide prediction models can be made by optimizing scale, customizing training samples to provide sets with the best examples, feature selection, etc. Herein, a novel approach, named Cross-Scaling, is proposed that includes the mixing of training and testing set resolutions. Hypothetically, training on a coarser resolution dataset and testing the model on a finer resolution should help the algorithm to better generalize ambiguous examples of landslide classes and yield fewer over/underestimations in the model. This ...Uroš Đurić, Miloš Marjanović, Zoran Radić, Biljana Abolmasov. " Machine learning based landslide assessment of the Belgrade metropolitan area: Pixel resolution effects and a cross-scaling concept" in Engineering Geology , Elsevier (2019). https://doi.org/10.1016/j.enggeo.2019.05.007
-
Results of comprehensive monitoring activities on Umka landslide, Belgrade, Serbia
Biljana Abolmasov, Uroš Đurić (2021)... Faculty of Mining and Geology, Serbia, biljana.abolmasov@rgf.bg.ac.rs 2University of Belgrade, Faculty of Civil Engineering, Serbia, udjuric@grf.bg.ac.rs Background The Umka landslide is the deepest and biggest active landslide in the Republic of Serbia and has been investigated and monitored by ...
... SAROGLOU N. DEPOUNTIS G. PAPATHANASSIOU 3% EUROPEAN REGIONAL CONFERENCE OF THE INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY & THE ENVIRONMENT Leading to Innovative Engineering Geology Practices VOLUME 1 Extended Abstracts Proceedings Organised by the National Group of Greece of IAEG ...
... will be focused on results and experience gained from automated Global Navigation Satellite System (GNSS) monitoring network data, PSInSAR data analysis from Sentinel1 radar satellite images, conventional geodetic monitoring network data and UAV imaging, processing and data analysis in the last six ...Biljana Abolmasov, Uroš Đurić . "Results of comprehensive monitoring activities on Umka landslide, Belgrade, Serbia" in 3rd European Regional Conference of IAEG/ Athens/ Greece/ 6-10 October 2021, IAEG National Group Greece (2021)
-
Constitutive Model for Analysis of Long-Term Municipal Solid Waste Landfill Settlement
Irena Basarić Ikodinović, Dragoslav Rakić, Mirjana Vukićević, Sanja Jocković, Jovana Janković Pantić (2022)Large long-term settlement occurs at the municipal solid waste landfills over an extended period of time which may lead to breakage of the geomembrane, damage of the cover systems, other protective systems or facilities constructed on top of a landfill. Also, municipal solid waste is an extremely heterogeneous material and its properties vary over location and time within a landfill. These material characteristics require the formulation of a new constitutive model to predict the long-term settlement of municipal solid ...Irena Basarić Ikodinović, Dragoslav Rakić, Mirjana Vukićević, Sanja Jocković, Jovana Janković Pantić. "Constitutive Model for Analysis of Long-Term Municipal Solid Waste Landfill Settlement" in ICEG 2022: International Conference on Environmental Geotechnics, World Academy of Science, Engineering and Technology (2022)