Претрага
2358 items
-
Multi-variable assessment of risk in selection of location and the way of open pit mines opening
Vujić Slobodan, Hudej Marjan, Miljanović Igor. "Multi-variable assessment of risk in selection of location and the way of open pit mines opening" in Proceedings of the 5th Balkan Mining Congress BALKANMINE 2011, 18-20.10.2013 - no. -, Ohrid, FYR Macedonia:ELEM, University Goce Delcev, Stip (2013): 1-6. https://doi.org/-
-
Application of Groundwater modeling for designing a dewatering system: Case study of the Buvač Open Pit Mine, Bosnia and Herzegovina
Polomčić Dušan, Bajić Dragoljub (2015)Polomčić Dušan, Bajić Dragoljub. "Application of Groundwater modeling for designing a dewatering system: Case study of the Buvač Open Pit Mine, Bosnia and Herzegovina" in Geologia Croatica 68 no. 2 (2015): 123-137. https://doi.org/10.4154/GC.2015.07
-
Uncertainty in open pit optimisation
Kolonja Božo, Stevanović Dejan, Pešić Georgiadis Milica, Banković Mirjana, Kolonja Ljiljana. "Uncertainty in open pit optimisation" in 5th International symposium Mining and environmental protection, Beograd:Faculty of Mining and geology, Belgrade (2015): 358-392
-
Environmental Noise Management in Serbian Open Pit Mines
Cvjetić Aleksandar, Lilić Nikola, Milisavljević Vladimir, Pantelić Uroš. "Environmental Noise Management in Serbian Open Pit Mines" in Mining and Environmental Protection, 6th International Symposium, MEP 17, Vrdnik, 21-24 June 2017, Beograd:University of Belgrade, Faculty of Mining and Geology (2017): 349-354
-
Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora
Šubaranović Tomislav, Petrović Branko, Ivoš Vladimir, Ristović Ivica. "Technical Solution for Reclamation of the Trachyte Open Pit Mine Kisnjeva Glava at Fruska Gora" in Proceedings of the VI International symposium on mining and environmental protection, Vrnjacka Banja, Serbia:University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2017): 206-210
-
Dewatering regime in flooded open pit and its impact on slope stability
Slavko M. Torbica, Veljko D. Lapčević, Lazar B. Stojanović. "Dewatering regime in flooded open pit and its impact on slope stability" in Tehnika (2014). https://doi.org/10.5937/tehnika1404591T
-
Seismic refraction surveys nearby open pit copper mine ”Veliki Krivelj”
Ignjatović Snežana, Kričak Lazar, Negovanović Milanka, Mitrović S.. "Seismic refraction surveys nearby open pit copper mine ”Veliki Krivelj”" in Proceedings of the 44th International October Conference on Mining and Metallurgy, Bor,Srbija:Mining and Metallurgy Institute Bor, University of Belgrade-Technical Faculty in Bor (2012): 27-32
-
Komparativna analiza završnih kontura površinskog kopa Drmno
Definisanje optimalne završne konture površinskog kopa od suštinskog je značaja za ostvarivanje strateških ciljeva u razvoju rudarskih projekata. Savremeni programski paketi i metode za optimizaciju granica kopa, zasnivaju se na pronalasku završne konture koja obezbeđuje maksimalan profit. U slučaju površinskih kopova uglja, kod kojih osim profita postoji i čitav niz dodatnih kriterijuma i strateških ciljeva, princip optimizacije granica prema profitu, najčešće nije u potpunosti primenjiv. Iz rog razloga za uspešno definisanje granica površinskih kopova, neophodno je sagledati čitavu lepezu ...Dejan Stevanović, Dragan Ignjatović, Tomislav Šubaranović, Mirjana Banković, Petar Marković. "Komparativna analiza završnih kontura površinskog kopa Drmno" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”
Since 1976 cement marl excavation at open-pit mine „Filijala” is carried out by continuous exploitation technology using bucket wheel excavator SH 400 manufactured by Orenstein und Koppel (O & K) company. Due to the bucket wheel excavator time-worn and high operating cost it was necessary to replace it with new one. In order to test the new bucket wheel excavator and prove its capacity a testing zone was defined as test block for excavation, in which the bucket wheel ...Vladimir Čebašek, Nebojša Gojković, Veljko Rupar, Miodrag Pribićević. "Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”" in Рударски гласник, Рударски институт - Београд (2020). https://doi.org/10.25075/BM.2020.07
-
Waste Dump Design Optimization, Case Study Open Pit Drmno
Stevanović Dejan, Banković Mirjana, Rupar Veljko, Milisavljević Vladimir, Cvjetić Aleksandar, Kržanović Daniel (2017)Stevanović Dejan, Banković Mirjana, Rupar Veljko, Milisavljević Vladimir, Cvjetić Aleksandar, Kržanović Daniel. "Waste Dump Design Optimization, Case Study Open Pit Drmno" in Mining and Environmental Protection, 6th International Symposium, MEP 17, Vrdnik, 21-24 June 2017, Beograd:University of Belgrade, Faculty of Mining and Geology (2017): 282-286
-
Late Miocene Lake Pannon marls from the Filijala open pit (Beocin, northern Serbia) – new geological and paleomagnetic data
Ganić Meri, Rundić Ljupko, Knežević Slobodan, Cvetkov Vesna. "Late Miocene Lake Pannon marls from the Filijala open pit (Beocin, northern Serbia) – new geological and paleomagnetic data" in Geološki anali Balkanskoga poluostrva 1 no. 71, Beograd:Univerzitet u Beogradu, Rudarsko-geološki fakultet (2010): 95-108. https://doi.org/10.2298/GABP1071001R
-
Analysis of Method for Determination of the Rock Mass Oscillation Equation Parameters in the Nepričava open pit
Lutovac Suzana, Gluščević Branko, Tokalić Rade, Majstorović Jelena, Beljić Čedomir. "Analysis of Method for Determination of the Rock Mass Oscillation Equation Parameters in the Nepričava open pit" in 6th International Symposium MINING AND ENVIRONMENTAL PROTECTION, Vrdnik, Serbia, 21-24.06.2017, Belgrade:Faculty of Mining and Geology, CENTER FOR ENVIRONMENTAL INGENEERING (2017): 317-323
-
Analysis of Blasting Impacts at the Open Pit Manastiriste near Topola on the Monastery Complex
Lutovac Suzana, Bajić Sanja, Gaćina Radmila, Urošević Katarina. "Analysis of Blasting Impacts at the Open Pit Manastiriste near Topola on the Monastery Complex" in Mining and Metallurgy Engineering Bor no. 2, Bor:Mining and Metallurgy Institute Bor (2016): 9-19. https://doi.org/10.5937/MMEB1602009B
-
A transient three-dimensional numerical model of water impermeable screen effects on the groundwater inflow reduction into the mine (Case Study: Open pit mine Drmno, Serbia)
Šubaranović Tomislav, Polomčić Dušan, Pavlović Vladimir, Pakić N. "A transient three-dimensional numerical model of water impermeable screen effects on the groundwater inflow reduction into the mine (Case Study: Open pit mine Drmno, Serbia)" in Proceedings on CD-ROM [Elektronski izvor]. Vol. 1-2 / 11th International Conference Research and Development in Mechanical Industry - RaDMI 2011, 15-18. September 2011, Sokobanja, Serbia, Vrnjačka Banja:Scientific and Technical Center for Intellectual Property (2011): 1257-1265
-
Effect of blasting on the adjacent building and mining structures at the open pit Kijevo
Lutovac Suzana, Tokalić Rade, Gluščević Branko, Vidanović Nebojša, Beljić Čedomir,. "Effect of blasting on the adjacent building and mining structures at the open pit Kijevo" in XXIV International Conference „ECOLOGICAL TRUTH“ ECO-IST16, Vrnjačka Banja, Serbia, :University of Belgrade – Technical Faculty in Bor (2016): 148-156
-
Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines
Kričak Lazar, Negovanović Milanka, Mitrović Stojan, Miljanović Igor, Nurić Samir, Nurić Adila (2015)Kričak Lazar, Negovanović Milanka, Mitrović Stojan, Miljanović Igor, Nurić Samir, Nurić Adila. "Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines" in The Journal of the Southern African Institute of Mining and Metallurgy 115 no. 11, Johannesburg, The South African Republic:The Southern African Institute of Mining and Metallurgy (2015): 1065-1071. https://doi.org/10.17159/2411-9717/2015/v115n1
-
BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations
Geology explorations in KCM runs from 1936. year up to these days and still ongoing. Results in >7,200 drill holes with ≈600,000 m of core drilling and gave lignite ore resources of > 4,1Bt, which 1,15Bt are excavated since 1986. of XIX up to early years of XXI century. For further mining operations in open pits stay 1,5Bt of lignite. Under waste heaps are ≈80 km2, additional 85 km2 should be filled. All of that masses/areas were, are ...Bojan Dimitrijević, Bogoljub Vučković, Radmila Gaćina. "BEYOND 2020 - Geology explorations and open pit activities affectation in reclamation designing in Kolubara Coal Mines (KCM) Serbia, new considerations" in 17th International Conference of the open and underwater mining of minerals, Sts. Constantine and Helena Resort, Varna, 18-22 September, Bulgaria, Sofia, Bulgaria : Scientific and Technical Union of Mining, Geology and Metallurgy, (2023)
-
Analysis of the exhaust emissions inventory from auxiliary mining machines
Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović (2023)Open-pit coal mines are equipped with a large number of mining machines and vehicles with diesel engines. Due to common daily operation of these machines and vehicles large amounts of exhaust gases which contain numerous pollutants are emitted into the atmosphere. The demand to reduce air pollution induced the activities in developed countries to map and calculate all gases emitted by industries to formulate and select adequate preventive activities. In collaboration with machine manufacturers, emission standards for off-road machines ...Stevan Đenadić, Aleksandar Mirković, Jovana Mitrović, Filip Miletić, Predrag Jovančić, Dragan Ignjatović. "Analysis of the exhaust emissions inventory from auxiliary mining machines" in 9th International Conference Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology (2023)
-
Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Evaluation And Perspectives Of Underground Coal Mines In Serbia
... (Soko, Strmosten pit in REMBAS mine, Lubnica and Štavalj) and for closure of those mines without potential (Tadenje and Jarando pits of Ibarski mines, Senjski rudnik pit of REMBAS, Bogovina and Vrška Čuka). This approach leaves Jasenovac mine and Block IV pit of REMBAS mine in between these two ...
... 8 mines and one company working as a contractor at other mines. AHP analysis, based on technical criteria, identified two groups of mines, one with potential for further development (Soko, Strmosten pit- REMBAS, Lubnica and Štavalj) and the other group of mines which should be closed in near future ...
... AHP method is given in the Table 7. It can be seen that Soko has the best ranking, while the Jarando pit of Ibarski mines has the worst ranking. This result is mainly because Soko has significant coal reserves, stable market and potential for improvement (mechanization and investment), while these ...Vladimir Milisavljević, Milena Lekić, Ivica Ristović, Vojin Čokorilo, Aleksandar Cvjetić. "Evaluation And Perspectives Of Underground Coal Mines In Serbia" in 7th Balkan Mining Congress Preceedings - BalkanMine2017, Prijedor, 11-13. oktobar 2017., Banjaluka : University of Banjalika, Faculty of Mining, RS, BiH (2017)