A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia
When assessing the potential of renewable energy alternatives for electricity generation, it is necessary to implement a multi-perspective approach that includes economic, technical, environmental, and socio-political criteria. For the evaluation of criteria and alternatives, the Fuzzy Analytical Hierarchy Process (FAHP) method is applied. The obtained weights are formed according to the values of energy indicators and expert judgments. The use of a fuzzy numerical value scale for the assessment of expert judgments and energy indicators provides a more sensitive ...... 12:19:33 A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia Boban Pavlović, Dejan Ivezić, Marija Živković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] A multi-criteria approach for ...
... sources Multi-criteria decision analysis Serbia a b s t r a c t When assessing the potential of renewable energy alternatives for electricity generation, it is necessary to implement a multi-perspective approach that includes economic, technical, environmental, and socio-political criteria. For the ...
... prioritizing, such as the multi-criteria assessments of different energy issues. Despite the limitations of a one-country model, which should be kept in mind when considering the on-going increasing role of cross-border exchanges in the electricity sector, the multi- criteria approach can still provide ...Boban Pavlović, Dejan Ivezić, Marija Živković. "A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia" in Energy Reports, Elsevier BV (2021). https://doi.org/10.1016/j.egyr.2021.02.072
-
Assessing Criteria Weights by the Symmetry Point of Criterion (Novel SPC Method) - Application in the Efficiency Evaluation of the Mineral Deposit Multi-Criteria Partitioning Algorithm
Information about the relative importance of each criterion or the weights of criteria can have a significant influence on the ultimate rank of alternatives. Accordingly, assessing the weights of criteria is a very important task in solving multi-criteria decision-making problems. Three methods are commonly used for assessing the weights of criteria: objective, subjective, and integrated methods. In this study, an objective approach is proposed to assess the weights of criteria, called SPC method (Symmetry Point of Criterion). This point ...Вишекритеријумско одлучивање, тежине критеријума, тачка симетрије критеријума, налазиште минерала, алгоритам, процена учинкаZoran Gligorić, Miloš Gligorić, Igor Miljanović, Suzana Lutovac, Aleksandar Milutinović. "Assessing Criteria Weights by the Symmetry Point of Criterion (Novel SPC Method) - Application in the Efficiency Evaluation of the Mineral Deposit Multi-Criteria Partitioning Algorithm" in Computer Modeling in Engineering & Sciences (2023). https://doi.org/10.32604/cmes.2023.025021
-
Long-term planning methodology for improving wood biomass utilization
The insufficiently developed forest management system is often followed by undeveloped forest resources supply chain and insufficient institutional support. These cause inefficient usage of fuel-wood as well as huge amounts of unused forest residues. In order to achieve optimal and long-term sustainable utilisation of biomass, an original methodology based on the interaction of mathematical optimization and backcasting approach has been developed. Mathematical optimization is used for both generation and consideration of techno-economic parameters of the forest biomass supply chain. ...Vladimir Vukašinović, Dušan Gordić, Marija Živković, Davor Koncalović, Dubravka Živković. "Long-term planning methodology for improving wood biomass utilization" in Energy, Elsevier BV (2019). https://doi.org/10.1016/j.energy.2019.03.105
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...... Cycle Engineering, Inc. Available online: www.LCE.com 6. Jankovic, I.; Djenadic, S.; Ignjatovic, D.; Jovancic, P.; Subaranovic, T.; Ristovic, I. Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining. Energies 2019, 12, 2245. https://doi.org/10.3390/en12122245 mn 292 ...
... 04:30:52 The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] The optimization of auxiliary ...
... available at: www.dr.rgf.bg.ac.rs 7% International Symposium MINING AND ENVIRONMENTAL PROTECTION 25 - 28 September 2019, Vrdnik, Serbia THE OPTIMIZATION OF AUXILIARY MACHINERY IN OPEN-CAST LIGNITE MINES: A CASE STUDY OF BULLDOZERS Dragan Ignjatović!, Predrag Jovančić!, Stevan Đenadić!, Ivan Janković ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije
Definisanje dugoročne dinamike razvoja rudarskih radova koja je u potpunosti usaglašena sa strateškim ciljevima Investitora, veoma je zahtevan zadatak, koji vrlo često podrazumeva veliki broj ograničenja. Adekvatno definisana dinamika razvoja rudarskih radova treba da obezbedi dugoročne zahteve u pogledu kapaciteta, kvaliteta i raspodele resursa neophodnih za ispunjavanje strateških ciljeva, koji se po pravilu svode na ostvarenje maksimalnog profita. Uspešno definisanje dinamike eksploatacije (posebno kod metaličnih ležišta) u najvećoj meri zavisi od optimizacije faznog razvoja površinskog kopa, odnosno od pravilnog ...Dejan Stevanović, Petar Marković, Mirjana Banković, Milan Živković. "Optimizacija faznog razvoja Površinskog kopa Ciganuša – Škorac u cilju definisanja dugoročne dinamike eksploatcije" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines
This paper presents the model for the identification of reference points on the lifetime curve of engineering systems. This curve commonly represents the increase and decline of failure in relation to time. A direct correlation between failure rate and costs is assumed in this paper, therefore, statistical and empirical analysis of costs provided reference points. This approach is used for positioning stages of the engineering system’s lifetime with a minimal number of failures and costs, regardless of whether these ...Electrical and Electronic Engineering,Industrial and Manufacturing Engineering, Control and Optimization, Mechanical Engineering, Computer Science (miscellaneous), Control and Systems EngineeringUgljesa Bugarić, Milos Tanasijević, Stevan Djenadić, Dragan Ignjatović, Ivan Janković. "Development of the Cost-Based Model for Monitoring the Lifetime of the Earth Moving Machines" in Machines, MDPI AG (2022). https://doi.org/10.3390/machines10110995
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Novel Hybrid MPSI–MARA Decision-Making Model for Support System Selection in an Underground Mine
objektivne težine kriterijuma, MPSI metoda, višekriterijumsko odlučivanje, MARA metoda, izbor sistema podgrade, podzemna eksploatacijaMiloš Gligorić, Zoran Gligorić, Suzana Lutovac, Milanka Negovanović, Zlatko Langović. "Novel Hybrid MPSI–MARA Decision-Making Model for Support System Selection in an Underground Mine" in Systems, MDPI AG (2022). https://doi.org/10.3390/systems10060248
-
Improving efficiency of thermal power plants through mine coal quality planning and control
Главни циљ контроле квалитета угља у рудницима лигнита је снабдевање термоелектрана угљем чији квалитет мора да се креће унутар одређених квалитативних ограничења. Карактеристике угља могу да утичу на ефикасност, поузданост и расположивост како котла тако и јединица за контролу емисије. У овом раду аутори су презентовали интегрисану симулацију рударског процеса као нови приступ у истраживању променљивости калоричне вредности угља приликом експлоатације комплексног лежишта лигнита. Резултати таквог приступа омогућавају драгоцен увид у перформансе континуалног рударског система у смислу контроле променљивости ...Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja. "Improving efficiency of thermal power plants through mine coal quality planning and control" in Thermal Science, Vinča Institute of Nuclear Sciences (2018). https://doi.org/10.2298/TSCI170605209B
-
Komparativna analiza završnih kontura površinskog kopa Drmno
Definisanje optimalne završne konture površinskog kopa od suštinskog je značaja za ostvarivanje strateških ciljeva u razvoju rudarskih projekata. Savremeni programski paketi i metode za optimizaciju granica kopa, zasnivaju se na pronalasku završne konture koja obezbeđuje maksimalan profit. U slučaju površinskih kopova uglja, kod kojih osim profita postoji i čitav niz dodatnih kriterijuma i strateških ciljeva, princip optimizacije granica prema profitu, najčešće nije u potpunosti primenjiv. Iz rog razloga za uspešno definisanje granica površinskih kopova, neophodno je sagledati čitavu lepezu ...Dejan Stevanović, Dragan Ignjatović, Tomislav Šubaranović, Mirjana Banković, Petar Marković. "Komparativna analiza završnih kontura površinskog kopa Drmno" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Mitigating hydrate formation in onshore gas wells: A case study on optimization techniques and prevention
Gas wells, particularly those situated onshore, play a vital role in the global energy sector by supplying a significant portion of natural gas. However, operational challenges, notably gas hydrate formation, pose substantial issues, leading to complications such as flowline blockages and unexpected well shutdowns. Gas hydrates, crystalline structures resembling ice, ...Gas Well, Gas Hydrate Formation, Well Modeling, Well Performance Optimization, Choke Position Adjustments, Methanol InjectionMilica Ješić, Bojan Martinović, Stefan Stančić, Miroslav Crnogorac, Dušan Danilović. "Mitigating hydrate formation in onshore gas wells: A case study on optimization techniques and prevention" in Underground Mining Engineering, Beograd : Rudarsko-geološki fakultet (2023)
-
Modeliranje tehnoloških procesa u rudarstvu u uslovima nedovoljnosti podataka primenom teorije grubih skupova
Zoran M. Štirbanović (2015-07-01)Rudarstvo, a u okviru njega i priprema mineralnih sirovina, se odlikuje složenošću tehnoloških procesa što je posledica velikog broja uticajnih parametara. Samim tim je potrebno biti veoma obazriv prilikom donošenja odluka u oblasti rudarstva. U cilju što efikasnijeg funkcionisanja procesa, moguće je primeniti različite metode koje služe za pojednostavljenje procesa odlučivanja. Jedna od takvih metoda jeste i teorija grubih skupova. Ona predstavlja relativno novu matematičku teoriju koja je pogodna za razumevanje nepreciznih i nepotpunih podataka kao i za otkrivanje ...rudarstvo, priprema mineralnih sirovina, teorija grubih skupova, višekriterijumsko odlučivanje, flotacijsko jalovište, flotacijski kolektor, flotaciona mašina... demonstrate the high sensitivity of the rough set theory in terms of multi-criteria decision-making and define its usefulness in terms of insufficiency of data. Key words: mining, mineral procesing, rough set theory, multi-criteria decision-making, flotation tailings landfill, flotation collector, ...
... verified by multi-criteria decision-making methods: VIKOR, AHP, ELECTRE, PROMETHEE and TOPSIS. Based on results it was concluded that rough set theory was successfully applied in all three problems. The superposition of the results obtained by the rough set theory with the results from other multi-criteria ...
... primenom teorije grubih skupova Univerzitet u Beogradu, Rudarsko-geološki fakultet 112 75. T. Chai, J. Ding, H. Wang, Multi-objective Hybrid Intelligent Optimization of Operational Indices for Industrial Processes and Application, http://eprints.ma.man.ac.uk/1604/01/covered/MIMS_ep2011_30 ...Zoran M. Štirbanović. "Modeliranje tehnoloških procesa u rudarstvu u uslovima nedovoljnosti podataka primenom teorije grubih skupova" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-07-01)
-
Optimisation of underground mine decline development system using genetic algorithm
... terminals are: mineral processing facility, surface breakout point and ore body access points. Brazil et al. created a software tool called Decline Optimization Toll (DOT). The heuristic methods used in DOT1 are replaced in the new version of the software tool, DOT2, by a method based on an understanding ...
... population, replacing the parent chromosomes in which they were derived from, producing a new generation. This cycle is performed until the optimization criterion is met (Shopova and Vaklieva-Banacheva, 2006). A typical genetic algorithm has the following structure: Optimisation of underground ...
... ; Tokalić R.; Milutinović A. REFERENCES 1 ALI, F.A. (2014) A novel hybrid genetic differential evolution algorithm for constrained optimization problems. International Journal of Advanced Computer Science and Applications, 3 (6), pp.6-12. 2 BRAZIL, M. et al. (2003) Optimising Declines ...Zoran Gligorić, Aleksandar Ganić, Rade Tokalić, Aleksandar Milutinović. "Optimisation of underground mine decline development system using genetic algorithm" in Underground mining engineering, Beograd : Univerzitet u Beogradu – Rudarsko–geološki fakultet (2014)
-
Novi model za postizanje optimalne proizvodnje na naftnom polju Amal
Elnori Elmabrouk Ali Elhaddad (2015-04-16)Doktorskom disertacijom analizirani su i proučavani problemi proizvodnje nafte iprimenjene metode za njihovo rešavanje na naftnom polju Amal. Ukratko jeprikazana proizvodnje nafte u Libiji, njene karakteristike i rezerve, da bi se videoznačaj ovog naftnog polja.Utvrđeno je da su na naftnom polju Amal ključni problemi koji prate procesproizvodnje taloženje parafina, pojava slojnog peska, neefikasan rad gasliftsistema, neefikasna desalinizacija nafte i ekološki problemi. Proizvodniproblemi, pojedinačno i više njih zajedno, na nekim bušotinama uzrokovali susmanjenje proizvodnje nafte od 40 do 75%. Zbog ...... reflected in the solving of a number of practical problems in oil production optimization process and the modeling of a new and more efficient oil exploitation technology. Key words: oil, production, optimization, Amal, Libya. Scientific field: Mining engineering ...
... Filtration and External Cake Build-up, Delft University of Technology, 159. Fariborz R., Ehsan K., Hanieh R. (2010) Oil Field Optimization Based on Gas Lift Optimization, 20th European Symposium on Computer Aided Process Engineering – ESCAPE20. Feiyue W., Hong L. (2012) Study on the divided-wall ...
... L., Sui W., Wen H. (2012) Optimization of proppant size for frac pack completion using a new equipment, Journal of Petroleum Science and Engineering, Volumes 96–97, 1-9. Gutierrez F., Hallquist A., Shippen M., Rashid K., (2007). “A new approach to gas lift optimization using an integrated asset ...Elnori Elmabrouk Ali Elhaddad. "Novi model za postizanje optimalne proizvodnje na naftnom polju Amal" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-16)
-
Novi model za postizanje optimalne proizvodnje na naftnom polju Amal
Elnori Elmabrouk Ali Elhaddad (2015-04-16)Doktorskom disertacijom analizirani su i proučavani problemi proizvodnje nafte iprimenjene metode za njihovo rešavanje na naftnom polju Amal. Ukratko jeprikazana proizvodnje nafte u Libiji, njene karakteristike i rezerve, da bi se videoznačaj ovog naftnog polja.Utvrđeno je da su na naftnom polju Amal ključni problemi koji prate procesproizvodnje taloženje parafina, pojava slojnog peska, neefikasan rad gasliftsistema, neefikasna desalinizacija nafte i ekološki problemi. Proizvodniproblemi, pojedinačno i više njih zajedno, na nekim bušotinama uzrokovali susmanjenje proizvodnje nafte od 40 do 75%. Zbog ...... reflected in the solving of a number of practical problems in oil production optimization process and the modeling of a new and more efficient oil exploitation technology. Key words: oil, production, optimization, Amal, Libya. Scientific field: Mining engineering ...
... Filtration and External Cake Build-up, Delft University of Technology, 159. Fariborz R., Ehsan K., Hanieh R. (2010) Oil Field Optimization Based on Gas Lift Optimization, 20th European Symposium on Computer Aided Process Engineering – ESCAPE20. Feiyue W., Hong L. (2012) Study on the divided-wall ...
... L., Sui W., Wen H. (2012) Optimization of proppant size for frac pack completion using a new equipment, Journal of Petroleum Science and Engineering, Volumes 96–97, 1-9. Gutierrez F., Hallquist A., Shippen M., Rashid K., (2007). “A new approach to gas lift optimization using an integrated asset ...Elnori Elmabrouk Ali Elhaddad. "Novi model za postizanje optimalne proizvodnje na naftnom polju Amal" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-04-16)
-
Uticaj ekstremnih procesa na rizike površinske eksploatacije
Nepredvidivi ekološki negativni slučajni procesi mogu uticati na geo-tehnički sistem pri površinskoj eksploataciji ležišta mineralnih sirovina, što u velikoj meri uvećava rizike i ugrožava realizaciju proizvodnje. Kvantitativna analiza sa proračunom verovatnoća pojava ovakvih ekstremnih događaja i procenom odgovarajućih ekonomskih posledica, posebno u uslovima globalnih klimatskih promena, omogućava definisanje rizika i optimizaciju parametara sistema površinske eksploatacije.Natalija Pavlović, Tomislav Šubaranović, Dragan Ignjatović. "Uticaj ekstremnih procesa na rizike površinske eksploatacije" in 15. međunarodna konferencija o površinskoj eksploataciji OMC 2022, Zlatibor, 12.-15.10.2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Uticaj geološke neizvesnosti u razvoju rudarskih projekata
Rudarstvo je industrija koja se nosi sa različitim vrstama neizvesnosti i rizika zbog svoje prirode i specifičnosti. Neizvesnost u rudarstvu može poticati iz različitih izvora i uticati na različite aspekte rudarskih projekata. Kao jedan od dominantnih faktora, ističe se geološka neizvesnost. Geološka neizvesnost igra ključnu ulogu u rudarstvu i može značajno uticati na procenu resursa i rezervi, planiranje eksploatacije, ekonomsku isplativost i upravljanje rizicima. Ova neizvesnost se ne može eliminisati, ali se uz primenu adekvatnih standarda i zakona može ...... Goodfellow R., Dimitrakopoulos R. (2016). Global optimization of open pit mining complexes with uncertainty. Applied Soft Computing , 40, 292-304. [11] Kolonja B., Stevanović D., Pešić-Georgiadis M., Banković M., Kolonja Lj. (2015). Uncertainty in pit optimization. Mining and Enviromental protection. Vrdnik ...
... and reserves, as well as the influence of the degree of reliability of the geological characteristics of the deposit on the results of the pit optimization, are shown. The analysis was carried out on an iron ore deposit and is based on the assumed uncertainty that may occur in the assessment of the ...
... in the ore (grade of iron in the ore). The results were generated in the Whittle software package. Keywords: geological uncertainty, risk, pit optimization, planning 1. Uvod Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja. Mogućnost ostvarenja ekonomskih i drugih ciljeva ...Petar Marković, Dejan Stevanović, Mirjana Banković. "Uticaj geološke neizvesnosti u razvoju rudarskih projekata" in XI Međunarodna konferencija "Ugalj i kritični minerali 2023", CCM 2023, Zlatibor, 11-14. oktobar 2023., Beograd : Jugoslovenski komitet za površinsku eksploataciju (2023)
-
Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic
Miroslav Crnogorac, Miloš Tanasijević, Dušan Danilović, Vesna Karović Maričić, Branko Leković (2020)Artificial lift methods have applications in oil wells where oil production is no longer possible due to natural reservoir energy, so this necessary energy is added by introducing lift methods. In order to achieve optimum production, the selection of an artificial lift method is very important. This paper uses fuzzy logic as a mathematical and conceptual model for selection of the optimal artificial lift method. The outcome or IF-THEN rules, as the central part of the model, is based ...... selection of artificial lift methods. These are the models created by applying multi-criteria analysis (TOPSIS, ELECTRE, SAW and VIKOR). Based on the known parameters, the expert gives estimates of the input data for the optimization model, and the output is the most suitable artificial lift method [11–14] ...
... has been chosen as a test well. The Salman oil field data are given in Table 4. Selection of mentioned method was done using an optimization model based on a multi-criteria analysis, specifically using the ELECTRE method [12]. The exploitation methods for application adequacy were ranked as output ...
... e location offshore electrical power utility well service pulling unit Selection of mentioned method was done using an optimization model based on a multi-criteria analysis, specifically using the ELECTRE method [12]. The exploitation methods for application adequacy were ranked as output ...Miroslav Crnogorac, Miloš Tanasijević, Dušan Danilović, Vesna Karović Maričić, Branko Leković. "Selection of Artificial Lift Methods: A Brief Review and New Model Based on Fuzzy Logic" in Energies, MDPI AG (2020)
-
Split-Desktop software for the analysis of fragment size distribution of blasted rock mass
Milanka Negovanović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić, Snežana Ignjatović (2023)Drobljenje stena je najvažniji pokazatelj u proceni efekata miniranja pri proizvodnom miniranju u površinskoj eksploataciji. Stepen drobljenja stena ima veliki uticaj na efikasnost daljih operacija utovara, transporta, drobljenja i mlevenja. Optimalno drobljenje stena pri proizvodnom miniranju utiče na smanjenje ukupnih troškova proizvodnje. Stoga je pouzdana procena veličine drobljenja odminirane stenske mase veoma važno pitanje, ne samo u operacijama miniranja, već i u rudarskoj proizvodnji. Za predviđanje distribucije veličine komada odminirane stenske mase postoje različiti empirijski modeli. KUZ-RAM model omogućava ...Milanka Negovanović, Lazar Kričak, Stefan Milanović, Jovan Marković, Nikola Simić, Snežana Ignjatović. "Split-Desktop software for the analysis of fragment size distribution of blasted rock mass" in 9th International Conference Mining and environmental protection, Sokobanja, Serbia, 24 – 27. May 2023, Belgrade : University of Belgrade, Faculty of Mining and Geology (2023)