Project BEWARE—Landslide Post-disaster Relief Activities for Local Communities in Serbia
Biljana Abolmasov, Dobrica Damjanović, Miloš Marjanović, Ranka Stanković, Velizar Nikolić, Sandra Nedeljković, Žarko Petrović (2017)... 3. BEWARE (GIS) web portal as a platform for interactive landslide event reporting, and unifying landslide data records 4. Improving land use planning documents of each munic- ipality—SWOT analysis of each municipality for justi- fying landslide hazard, vulnerability and risk analysis 5. Identifying ...
... beware/ (Fig. 8). All data and data analysis and results are open access data. 4. SWOT analysis—SWOT analysis of available data for land-use/urban planning and human resources of each municipality were performed. Additional recommenda- tions and improvements for Master Plan were introduced for all ...
... sites—Identifying up to 10 critical landslide sites that require remediation. WP9—Sustainability arising from good practices of BEWARE—Examining methodology of voluntary crowd sourcing data (i.e. RPs involvement in reporting landslide events and general public involvement in the future) for translating ...Biljana Abolmasov, Dobrica Damjanović, Miloš Marjanović, Ranka Stanković, Velizar Nikolić, Sandra Nedeljković, Žarko Petrović. "Project BEWARE—Landslide Post-disaster Relief Activities for Local Communities in Serbia" in Advancing Culture of Living with Landslides, Proceedings of 4th World Landslide Forum, Ljubljana 29 May-02 June 2017 3, Berlin : Springer Interantional (2017). https://doi.org/10.1007/978-3-319-53487-9_48
-
Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning
The process of creating a geological block model as the basis for a further detailed design and planning of mining operations is a very responsible task. Errors made during this initial process are transferred to all other phases of the mining project. Certainly, one of the most important decisions for the modelling process is the choice of the appropriate size of the blocks that form the model itself. The determination of the optimal block size is not a simple ...dimenzije minibloka, višekriterijumska analiza, AHP, modeliranje ležišta, planiranje na površinskim kopovimaPetar Marković, Dejan Stevanović, Milica Pešić Georgiadis, Mirjana Banković. "Application of MCDA in the determination of optimal block size for open-pit modelling and mine planning" in Underground Mining Engineering, Univerzitet u Beogradu, Rudarsko-geološki fakultet (2021)
-
Managing mining project documentation using human language technology
Purpose: This paper aims to develop a system, which would enable efficient management and exploitation of documentation in electronic form, related to mining projects, with information retrieval and information extraction (IE) features, using various language resources and natural language processing. Design/methodology/approach: The system is designed to integrate textual, lexical, semantic and terminological resources, enabling advanced document search and extraction of information. These resources are integrated with a set of Web services and applications, for different user profiles and use-cases. Findings: The ...Digital libraries, Information retrieval, Data mining, Human language technologies, Project documentationAleksandra Tomašević, Ranka Stanković, Miloš Utvić, Ivan Obradović, Božo Kolonja . "Managing mining project documentation using human language technology" in The Electronic Library (2018). https://doi.org/10.1108/EL-11-2017-0239
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
Integrated energy planning approach for accelerating energy transition of households
The success of energy transition planning depends on several influential and variable factors that need to be considered and tracked in modeling to support policymakers. Expert-based energy models are mainly developed following the assumptions of experts and, in most cases, a limited number of stakeholders. This top-down modeling approach will provide satisfactory results in centrally managed energy sectors (electricity generation and distribution, district heating, etc.), where further decisions could be projected relatively precisely. However, the same approach will not ...Energetsko planiranje, Integrisano energetsko modeliranje, Energetska tranzicija, Domaćinstva, Individualno grejanje, LEAPBoban Pavlović, Marija Živković, Dejan Ivezić. "Integrated energy planning approach for accelerating energy transition of households" in Energy Reports, Elsevier BV (2023). https://doi.org/10.1016/j.egyr.2023.11.016
-
Geochemical evaluation of dolostone deposits in Montenegro: Implications for potential industrial applications
Darko Bozovic, Vladimir Simic, Dragan Radulovic, Slobodan Radusinovic, Vesna Matovic, Anja Terzic (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...примарне сировине, минералогија, физичко-механичка својства, технолошка својства, наука о материјалимаDarko Bozovic, Vladimir Simic, Dragan Radulovic, Slobodan Radusinovic, Vesna Matovic, Anja Terzic. "Geochemical evaluation of dolostone deposits in Montenegro: Implications for potential industrial applications" in Science of Sintering, Bor, August 2024, National Library of Serbia (2024). https://doi.org/10.2298/SOS240701029B
-
Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia
Noise emissions are a significant environmental impact caused by the mining industry in all technological phases of surface mining, mineral processing, and waste disposal. This paper presents the role of noise impact assessment and control in large-scale surface mining operations. Mine planning develops the model of mining operations, ore excavation, and waste dumping scheduling and processing rates, including spatial distribution of mining activities. Such a level of mine planning requires an environmental impact assessment study. This can be achieved ...Uros Pantelic, Petar Lilic, Aleksandar Cvjetic, Nikola Lilic. "Environmental Noise Impact Assessment for Large-Scale Surface Mining Operations in Serbia" in Sustainability, MDPI AG (2023). https://doi.org/10.3390/su15031798
-
A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia
When assessing the potential of renewable energy alternatives for electricity generation, it is necessary to implement a multi-perspective approach that includes economic, technical, environmental, and socio-political criteria. For the evaluation of criteria and alternatives, the Fuzzy Analytical Hierarchy Process (FAHP) method is applied. The obtained weights are formed according to the values of energy indicators and expert judgments. The use of a fuzzy numerical value scale for the assessment of expert judgments and energy indicators provides a more sensitive ...... electricity generation. The pre- sented approach of the integrated assessment concerning con- flicting criteria might serve decision-makers in long-term energy planning. The proposed FAHP model which involves pairwise compar- isons based on experts‘ judgments and energy indicators is ap- plied to assess the ...
... system from a system based largely on fossil fuels to one that increases the efficiency and share of renewables (IRE, 2018). A transition to- wards long-term sustainability in global energy systems based on renewable energy sources (RESs) can simultaneously miti- gate issues such as greenhouse gas emissions ...
... be focused on investigating a different integrated fuzzy multi-criteria decision-making methodology for solving this problem. CRediT authorship contribution statement Boban Pavlović: Conceptualization, Methodology, Investiga- tion, Project administration, Writing - original draft. Dejan Ivezić: Conc ...Boban Pavlović, Dejan Ivezić, Marija Živković. "A multi-criteria approach for assessing the potential of renewable energy sources for electricity generation: Case Serbia" in Energy Reports, Elsevier BV (2021). https://doi.org/10.1016/j.egyr.2021.02.072
-
Review: Methodological approaches and research techniques for addressing construction and remediation problems in karst reservoirs
Saša Milanović, Ljiljana Vasić (2021)Saša Milanović, Ljiljana Vasić. "Review: Methodological approaches and research techniques for addressing construction and remediation problems in karst reservoirs" in Hydrogeology Journal, Springer Science and Business Media LLC (2021). https://doi.org/10.1007/s10040-020-02280-1
-
Процјена хазарда и ризика од клизишта за различите нивое просторног планирања у Републици Српској, БиХ
Цвјетко С. Сандић (2022)Територија Републике Српске је у посљедних десетак година веома угрожена активирањем нових и реактивирањем старих клизишта. Она својим дјеловањем наносе огромне материјалне штете, па и људске жртве, те је неопходно озбиљније третирање и дјеловање у борби са овим природним хазардом. Чест проблем јесте одговорност, тј. надлежност институција из ове области и недостатак у законској регулативи која готово никако или само површно обрађује област хазарда и ризика од клизишта. Усљед непостојања праксе и усвојених методологија које су у примјени у свијету, циљ ...Цвјетко С. Сандић. Процјена хазарда и ризика од клизишта за различите нивое просторног планирања у Републици Српској, БиХ, Београд : [Ц. Сандић], 2022
-
Methodology of Geotechnical Investigation of Terrain for Road Design and Construction in Bendel State of Nigeria
Henry N. Erebor (1980)Henry N. Erebor. Methodology of Geotechnical Investigation of Terrain for Road Design and Construction in Bendel State of Nigeria, Faculty of Mining and Geology, 1980
-
Technological Model of Coal Deposit - base for Mine Production Planning
Gligorić Zoran, Gligorić Miloš, Štrbac-Savić Svetlana. "Technological Model of Coal Deposit - base for Mine Production Planning" in 2nd Virtual International Conference on Science, Niš:Research and Development Center ALFATEC (2016)
-
Ventilation Planning and Design of the Omerler B Mine
Lilić Nikola, Čokorilo Vojin, Cvjetić Aleksandar, Milisavljević Vladimir. "Ventilation Planning and Design of the Omerler B Mine" in Podzemni radovi no. 21, Beograd:Rudarsko-geološki fakultet (2012): 33-42
-
Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction
A methodology for determining overbreaks in hard rock tunnel construction using the drill-and-blast technique is presented in this paper. The methodology was developed for and applied to crystalline medium- to thick-bedded limestone, but it can be used in any jointed hard rock mass. Overbreaks are inevitable in hard rock tunnelling in a low-confinement environment (shallow tunnels up to several hundred meters deep) as a result of wedge failures along unfavourably oriented discontinuities caused by blasting. It is widely accepted ...hard rock, drill-and-blast, geological overbreak, technological overbreak, stability criterion, discontinuity orientation, tunnel constructionZoran Berisavljević, Dragoljub Bajić, Vojkan Jovičić. "Development and Application of Methodology for Quantification of Overbreaks in Hard Rock Tunnel Construction" in Applied Sciences, MDPI (2023). https://doi.org/10.3390/app13031379
-
Application of structure models in planning the development of epis production sectors
Maksimović Svetomir, Miljanović Igor, Petrovski Aleksandar, Josipović Pejović Milena. "Application of structure models in planning the development of epis production sectors" in Proceedings of 22nd International Mining Congress, 11-13.05.2011 - no. -, Ankara, Turkey:UCTEA, The Chamber of Mining Engineers of Turkey (2011): 21-28. https://doi.org/-
-
Natural Hazard Assessment for Land-Use Planning in Serbia
Dragićević Slavoljub, Filipović Dejan, Kostadinov Stanimir, Ristić Ratko, Novković Ivan, Živković Nenad, Anđelković Gordana, Abolmasov Biljana, Šećerov Velimir, Đurđić Snežana (2011)Dragićević Slavoljub, Filipović Dejan, Kostadinov Stanimir, Ristić Ratko, Novković Ivan, Živković Nenad, Anđelković Gordana, Abolmasov Biljana, Šećerov Velimir, Đurđić Snežana. "Natural Hazard Assessment for Land-Use Planning in Serbia" in International Journal of Environmental Research 5 no. 2, Tehran, Iran:University of Tehran (2011): 371-380
-
Ventilation Planning and Design of the Derin Sahalar Mine
Lilić Nikola, Čokorilo Vojin, Cvjetić Aleksandar, Milisavljević Vladimir. "Ventilation Planning and Design of the Derin Sahalar Mine" in Tehnika no. 3, Beograd:Savez Inžinjera i Tehničara Srbije (2013): 425-431
-
Torrential floods and town and country planning in Serbia
Ristić Ratko, Kostadinov Stanimir, Abolmasov Biljana, Dragićević Slavoljub, Trivan Goran, Radić Branko, Trifunović Milan, Radosavljević Zoran (2012)Ristić Ratko, Kostadinov Stanimir, Abolmasov Biljana, Dragićević Slavoljub, Trivan Goran, Radić Branko, Trifunović Milan, Radosavljević Zoran. "Torrential floods and town and country planning in Serbia" in Natural Hazards and Earth System Sciencies 12 no. 1, :Journal of the European Geosciences Union, Copernicus Publication (2012): 23-35. https://doi.org/10.5194/nhess-12-23-2012
-
The deterministic fuzzy linear approach in planning the production of mine system with several open pits
Vujić Slobodan, Miljanović Igor, Kuzmanović Marija, Zoran Bartulović, Gajić Grozdana, Lazić Predrag (2011)Vujić Slobodan, Miljanović Igor, Kuzmanović Marija, Zoran Bartulović, Gajić Grozdana, Lazić Predrag. "The deterministic fuzzy linear approach in planning the production of mine system with several open pits" in Archives of Mining Sciences 56 no. 3, -:Polish Academy of Sciences - Committee of Mining (2011): 489-497. https://doi.org/-
-
Maximizing the net present value by applying an optimal cut-off grade for long-term planning of the copper open pits
Kržanović Daniel, Kolonja Božo, Stevanović Dejan. "Maximizing the net present value by applying an optimal cut-off grade for long-term planning of the copper open pits" in Acta Montanistica Slovaca 20 no. 1, Kosice:Faculty of Mining, Ecology, Process Control and Geotechnologies (FBERG), Technical University of Kosice (2015): 49-61