Developing and Application of Software for Determining Parameters of Drainage on Designed Embankment
Nurić Adila, Nurić Samir, Kričak Lazar, Negovanović Milanka. "Developing and Application of Software for Determining Parameters of Drainage on Designed Embankment" in International Journal of Engineering Works 2 no. 5, Beijing, China:KWPublisher (2015): 58-65. https://doi.org/10.5281/zenodo.17402
-
Preliminary results of numerical modelling of debris flow - case study Leva reka, Serbia
Krušić Jelka, Samardžić Petrović Mileva, Marjanović Miloš, Abolmasov Biljana, Miljković Stevan (2018)Krušić Jelka, Samardžić Petrović Mileva, Marjanović Miloš, Abolmasov Biljana, Miljković Stevan. "Preliminary results of numerical modelling of debris flow - case study Leva reka, Serbia" in Proceedings of the 16th Danube-European Conference on Geotechnical Engineering-Geotechnical hazards and risks: Experiences and practices, Skopje, Republic of Macedonia 2, :Willey Ernst and Sons (2018): 707-712
-
Fe doped TiO2 prepared by microwave-assisted hydrothermal process for removal of As(III) and As(V) from water
Anđelković Ivan B, Stanković Dalibor M, Nešić Jelena, Krstić Jugoslav B, Vulić Predrag, Manojlović Dragan D, Roglić Goran M (2014)Anđelković Ivan B, Stanković Dalibor M, Nešić Jelena, Krstić Jugoslav B, Vulić Predrag, Manojlović Dragan D, Roglić Goran M. "Fe doped TiO2 prepared by microwave-assisted hydrothermal process for removal of As(III) and As(V) from water" in Industrial and Engineering Chemistry Research 53 no. 27, Washington:American Chemical Society (2014): 10841-10848. https://doi.org/10.1021/ie500849r
-
Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software
The development of modern technologies has enabled the application of specialized softwares in the field of mining through various segments and processes, including in works related to drilling and blasting. The application of specialized software for drilling and blasting with the use of modern technologies such as photogrammetry enabled more accurate data from the field for later processing. By processing data and creating a 3D model of the terrain for drilling and blasting works, it can obtain precise data, ...Stefan Milanović, Nikola Simić, Lazar Kričak, Milanka Negovanović, Nikola Đokić. "Optimization and Analysis of Drilling and Blasting Parameters Using O-Pitblast Software" in Podzemni radovi, Beograd : Rudarsko-geološki fakultet (2024)
-
Deformation and permeability of cement stone of diferent composition in hard formations
Bošković Zvonimir, Čebašek Vladimir, Nuhanović Sanel, Crnogorac Jovana. "Deformation and permeability of cement stone of diferent composition in hard formations" in Rudarski radovi/Mining Engineering no. 2, Resavica:Komitet za podzemnu eksploataciju mineralnih sirovina/Committee of Underground Exploitation of the Mineral Deposits (2014): 37-45
-
Hidrodinamički proračun zaštite površinskog kopa Drmno od podzemnih voda u periodu 2018-2022. godina
Površinski kop lignita Drmno nalazi se u blizini velikih reka (Dunav i Mlava), zbog čega eksploatacija otkrivke i lignita u velikoj meri zavisi od sistema zaštite od podzemnih voda. Ukoliko je sistem zaštite od podzemnih voda dobro isplaniran, a njegov kapacitet dobro proračunat, onda će se eksploatacija obavljati u suvoj sredini, što podrazumeva sigurnu proizvodnju otkrivke i lignita. U današnje vreme uz primenu adekvatnih softvera olakšano je kvalitetno planiranje i proračunavanje sistema za zaštitu površinskih kopova od podzemnih voda. ...Dušan Polomčić, Tomislav Šubaranović, Zoran Stojićević. "Hidrodinamički proračun zaštite površinskog kopa Drmno od podzemnih voda u periodu 2018-2022. godina" in Zbornik apstrakata sa 9. Međunarodne konferencije Ugalj, Zlatibor, 2019., Jugoslovenski komitet za površinsku eksploataciju (2019)
-
2D geoelectrical resistivity tomography application at the former city waste dump "Ada Huja": Eco-geological problem
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs UNDERGROUND MINING ENGINEERING 34 (2019) 59-76 UDK 62 UNIVERSITY OF BELGRADE - FACULTY OF MINING AND GEOLOGY ISSN 03542904 ...
... after this the engineering part starts (correct isolation of the hole, pipelines for oxygen pumping and methane recovery, mini-station for leachate treatment etc.) Geoelectrical and geotechnical investigations that were carried out on the terrain established a marl foundation. Pure marl is a c ...
... in the form of needed funds, reliability and acquisition speed. Further surveys showed a good correlation between the borehole data and 2D inversion process. The location of the surveyed area is a very interesting terrain in a form of civil engineering opportunities, because of its proximity to ...Branislav Sretenović, Filip Arnaut, Ivana Vasiljević, Vesna Cvetkov. "2D geoelectrical resistivity tomography application at the former city waste dump "Ada Huja": Eco-geological problem" in Podzemni radovi, Centre for Evaluation in Education and Science (CEON/CEES) (2019). https://doi.org/10.5937/PodRad1934059S
-
Investigating distant effects of the Moesian promontory: Brittle tectonics along the western boundary of the Getic unit (East Serbia)
In this study, we report evidence for brittle deformation in a part of the Carpatho–Balkan orogen, which is explained in terms of effects of the rigid Moesian promontory of the European plate on fault kinematics in East Serbia. We focus on the westernmost part of the Getic Unit of the East Serbian Carpatho–Balkanides, i.e. the Gornjak–Ravanica Unit, located between two main thrusts that were repeatedly activated from Early Cretaceous to recent times. We combine a new data set on ...Getikum, Mezijska jedinica, Karpato-balkanski orogen, krte deformacije, Gornjačko-ravanička jedinicaAna Mladenović, Milorad D. Antić, Branislav Trivić, Vladica Cvetković. "Investigating distant effects of the Moesian promontory: Brittle tectonics along the western boundary of the Getic unit (East Serbia)" in Swiss Journal of Geosciences, Springer (2019). https://doi.org/10.1007/s00015-018-0324-5
-
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”
... rs Thamer Rayes Diyab Dr.Lecturer University of Babylon College of Engineering Faculty of Environment Engineering Babylon - Iraq tdiyab@ymail.com Rade Tokalic Associate professor University of Belgrade Faculty of Mining and Geology Mining Department Belgrade – Serbia rade.tokalic@rgf.bg.ac ...
... 35-43, 2005. SCHOFIELD, W., BREACH M. Engineering surveying. UK: Elsevier, 2007. STOILJKOVIC, V. et alii. Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2 SD adit of the "Blagodat". Underground Mining Engineering, n. 23, p. 33-44, 2013. WOLF, P. R ...
... are vastly spread both horizontally and vertically (approximately 300m in thickness) and discordantly lies over the older beds. They are consisted of sandy and grav- elly clays, clayly and ironaceus quartz sands and semi-consolidated sand- stones, laterally and vertically shifting on the bauxite ...Aleksandar Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, Rade Tokalić, Meri Ganić. "Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”" in Revista Escola de Minas, School of Mines Magazine, Sao paulo, Brasil : SciELO (2015)
-
Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2SD adit of the Blagodat
Stoiljković Vladimir, Milutinović Aleksandar, Ganić Aleksandar, Mikanović Radenko. "Apriori accuracy evaluation for the crosscut in a horizontal plane between the VI horizon and the P2SD adit of the Blagodat" in Časopis Underground Mining Engineering/Podzemni radovi no. 23, Beograd:Rudarsko-geološki fakultet, Beograd (2013): 33-44
-
Deformation and permeability of cement stone of diferent composition in soft to medium hard formations
Bošković Zvonimir, Čebašek Vladimir, Nuhanović Sanel, Crnogorac Jovana. "Deformation and permeability of cement stone of diferent composition in soft to medium hard formations" in Rudarski radovi/Mining Engineering no. 2, Resavica:Komitet za podzemnu eksploataciju mineralnih sirovina/Committee of Underground Exploitation of the Mineral Deposits (2014): 46-53
-
Foliation impact on the dynamic properties of selected samples of the barrier dam site Prvonek: Right side
Majstorović Jelena, Tokalić Rade, Lutovac Suzana, Savković Snežana. "Foliation impact on the dynamic properties of selected samples of the barrier dam site Prvonek: Right side" in Underground Mining Engineering no. 29, Beograd:University of Belgrade – Faculty of Mining and Geology (2016): 1-9
-
Integrated energy planning approach for accelerating energy transition of households
The success of energy transition planning depends on several influential and variable factors that need to be considered and tracked in modeling to support policymakers. Expert-based energy models are mainly developed following the assumptions of experts and, in most cases, a limited number of stakeholders. This top-down modeling approach will provide satisfactory results in centrally managed energy sectors (electricity generation and distribution, district heating, etc.), where further decisions could be projected relatively precisely. However, the same approach will not ...Energetsko planiranje, Integrisano energetsko modeliranje, Energetska tranzicija, Domaćinstva, Individualno grejanje, LEAPBoban Pavlović, Marija Živković, Dejan Ivezić. "Integrated energy planning approach for accelerating energy transition of households" in Energy Reports, Elsevier BV (2023). https://doi.org/10.1016/j.egyr.2023.11.016
-
The first experiences of the landslide monitoring using TLS and autonomous GNSS sensors in Serbia – case study
Pejić Marko, Abolmasov Biljana, Pejović Milutin, Božić Branko, Gospavić Zagorka, Milovanović Branko (2011)Pejić Marko, Abolmasov Biljana, Pejović Milutin, Božić Branko, Gospavić Zagorka, Milovanović Branko. "The first experiences of the landslide monitoring using TLS and autonomous GNSS sensors in Serbia – case study" in Proceedings of 5th International Conference on Engineering Surveying, Brijuni, Croatia:University of Zagreb, Croatia (2011): 219-228
-
Rock Stability Analysis On The Model Of Designed And Constructed Roadways In The Jama Bor
Zlatanović Dragan, Milisavlјević Vladimir, Tokalić Rade, Čebašek Vladimir. "Rock Stability Analysis On The Model Of Designed And Constructed Roadways In The Jama Bor" in Underground Mining Engineering - Podzemni radovi no. 26, :Univerzitet u Beograd - Rudarsko-geološki fakultet (2015): 35-47
-
Reducing environmental impact caused by mining activities in limestone mines
Radmila Gaćina, Bojan Dimitrijević (2022)Mining and its related activities have always resulted in changes in the environment and these changes can vary from one area to another. As a result of mining, several types of changes can be distinguished: destruction of land and existing vegetation, changes in terrain topography, modification in air quality, changes in surface and groundwater quality, as well as change geotechnical conditions of the rock. Environmental impact of mining have been a public concern. There is widespread global interest in mining ...Radmila Gaćina, Bojan Dimitrijević. "Reducing environmental impact caused by mining activities in limestone mines" in Underground mining engineering , Belgrade : University of Belgrade - Faculty of Mining and Geology (2022)
-
Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine
... mass from its equilibrium position. Such oscillation of the rock mass particles is manifested as a shock and represents one of the negative effects of blasting. In order both to evaluate and control the seismic effect of blasting, as well as to plan it, the determination of soil oscillation law is required ...
... fakultet Univerziteta u Beogradu. 9 TRAJKOVIĆ, S., LUTOVAC, S. and RAVILIĆ, M. (2013) Assessment of impact on environment and constructed facilities owing to blasting at open pit mine "Nepričava". Underground Mining Engineering, 22, pp. 33-48. 10 VUKADINOVIĆ, S. (1970) Elementi računa verovatnoće ...
... as regards seismic effect, under control, which gives an opportunity to plan the magnitude of shock waves for each future blast operation (Trajković et al. 2005). In this manner, the negative effects of blasting are reduced, production efficiency is increased and, at the same time, building structures ...Suzana Lutovac, Sanja Bajić, Marina Ravilić, Radmila Gaćina. "Parameter determination of soil oscillation law using quotient of the relative growth increments of oscillation velocity and reduced distances at “Nepričava“ open pit mine" in Underground Mining Engineering, Belgrade : University of Belgrade, Faculty of Mining and Geology (2015). https://doi.org/10.5937/podrad1526009L
-
An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System
In this paper we describe the approach that has been used in the development of the Management Information System (MIS) in the Coal Mine Pljevlja in Montenegro. The methodology of this approach was based on new information technologies and management techniques which have already been successfully applied in other related fields. Its main goal was to introduce modern management techniques to mining, adapted to specific features of the mining industry, its operations and environment, thus enabling the tactical management ...... delineation, development, production and waste management. Design and planning of these processes in the future needs to be closely integrated into more holistic mining systems, considering all controlling factors and impacts (technical, economic, environmental and social). It is crucial for the mining ...
... Managers and analysts who often require higher levels of aggregated views on business data use this technology. Online analytical processing is a capability of management, decision support and executive information systems that enables managers and analysts to interactively examine and manipulate ...
... up the possibilities for the Mine to integrate its systems with IT solutions of third parties - business partners and clients, in a single business chain through Internet. Furthermore, e-business contributes to competitiveness, cost reduction and facilitates the accomplishment of production tasks ...Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović. "An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System" in Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, September 2006, Vol. 1,, Balkema (2006)
-
Sepiolite – a by-product of exploitation as a potential raw material in Serbian industry
This paper gives a brief overview of the sepiolite deposits, the basic properties, and the possibilities of using this mineral. Particular attention is paid to sepiolites from domestic production, especially the use of sepiolites suitable for the development of small businesses and technologies, with a focus on environmental protection. Aim of this paper is to point out importance of this mineral and to draw attention to the use of domestic raw materials. With appropriate mechanical and chemical pretreatments, sepiolite is ...Radmila Gaćina, Katarina Urošević, Jelena Zakonović. "Sepiolite – a by-product of exploitation as a potential raw material in Serbian industry" in Underground mining engineering , Belgrade : University of Belgrade - Faculty of Mining and Geology (2019). https://doi.org/10.5937/podrad1935081G
-
Landslides risk in Serbia – Case study Jovac landslide
Jevremović Dragutin, Kostić Srđan (2011)Jevremović Dragutin, Kostić Srđan. "Landslides risk in Serbia – Case study Jovac landslide" in Environmental Geosciences and Engineering Survey for Territory Protection and Population Safety, International conference, EngeoPro, Moscow, Russia: (2011)