Претрага
225 items
-
Models of Determining the Parameters of Rock Mass Oscillation Equation with Experimental and Mass Blastings
... research carried out in Majdanpek open pit, situated in northern part of east Serbia and, • Investigations carried out during mass blasting in Nepričava open pit, located in central Serbia. Minerals 2018, 8, 70 9 of 18 4.1. Experimental Investigation in Majdanpek Open Pit 4.1.1. General Characteristics ...
... the Equation (54)). Minerals 2018, 8, 70 13 of 18 4.2. Investigation during Mass Mining in Nepričava Open Pit 4.2.1. General Characteristics of Nepričava Open Pit The Nepričava open pit is a part of the municipality of Lajkovac. It is situated on the left bank of the Kolubara River in Central ...
... Practical part of this paper includes the experimental research carried out at Majdanpek open pit, located in the northern part of eastern Serbia and the investigations carried out during mass blasting at Nepričava open pit, located in central Serbia. In this paper, parameters n and K from Sadovskii’s equation ...Suzana Lutovac, Branko Gluščević, Rade Tokalić, Jelena Majstorović, Čedomir Beljić. "Models of Determining the Parameters of Rock Mass Oscillation Equation with Experimental and Mass Blastings" in Minerals, Basel : MDPI AG, Basel, Switzerland (2018). https://doi.org/10.3390/min8020070
-
Ground surface subsidence monitoring using sentinel-1 in the “Kostolac” open pit coal mine
Zoran Gojković, Milan Kilibarda, Ljiljana Brajović, Miloš Marjanović, Aleksandar Milutinović, Aleksandar Ganić (2023)Open pit coal mining affects surrounding populated areas, resulting in terrain surface deformation. Surface deformation should be monitored as often as possible to control deformations and prevent potential incidents. This paper analyzes time series deformation estimated from the Sentinel-1 satellite images using the Persistent Scatterer Interferometry method to monitor subsidence rates caused by open pit mining activities. It is possible to measure deformations using classical geodetic methods, but those are rarely used in practice because they are time-consuming and ...Zoran Gojković, Milan Kilibarda, Ljiljana Brajović, Miloš Marjanović, Aleksandar Milutinović, Aleksandar Ganić. "Ground surface subsidence monitoring using sentinel-1 in the “Kostolac” open pit coal mine" in Remote Sensing (2023). https://doi.org/10.3390/rs15102519
-
Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”
Since 1976 cement marl excavation at open-pit mine „Filijala” is carried out by continuous exploitation technology using bucket wheel excavator SH 400 manufactured by Orenstein und Koppel (O & K) company. Due to the bucket wheel excavator time-worn and high operating cost it was necessary to replace it with new one. In order to test the new bucket wheel excavator and prove its capacity a testing zone was defined as test block for excavation, in which the bucket wheel ...Vladimir Čebašek, Nebojša Gojković, Veljko Rupar, Miodrag Pribićević. "Geomechnical research for the new bucket wheel excavator testing at Open pit “Filijala”" in Рударски гласник, Рударски институт - Београд (2020). https://doi.org/10.25075/BM.2020.07
-
Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”
... till 2010 by using the open pit method of mining at the central and northern part of the deposit up to the +410m. Above this level, in the southern part, 1,120,000t of ore reserves remained. A feasibility study on the pos- sible expansion of open pit established that open pit mining of this part of ...
... s of points in the pit; - Detailed scanning of the open pit levels (Figure 5), which are interactive with the designed bench drifts for the purposes of geomechanical analysis of the stability; - Detailed scanning of the existing mine chambers. Figure 5 Parts of open pit benches in interaction ...
... surface and into the open pit. Large number of mining and surveying works will follow the completion of this project, but in the meantime, this paper shows the a priory accuracy assessment of the spatial position of the point, it being the exit point to the existing bench of the open pit at the elevation ...Aleksandar Milutinović, Aleksandar Ganić, Thamer Rayes Diyab, Rade Tokalić, Meri Ganić. "Mine surveying works for the purpose of excavating the remaining reserves of bauxite in the deposit of “Podbracan”" in Revista Escola de Minas, School of Mines Magazine, Sao paulo, Brasil : SciELO (2015)
-
Conditions for efficiency of open pit medium voltage power transformers
Aleksandrović Snežana (2017)Aleksandrović Snežana. "Conditions for efficiency of open pit medium voltage power transformers" in 3rd Virtual International Conference on Science, Technology and Management in Energy no. 3, Niš, Serbia:Research and Development Center “ALFATEC” (2017): 77-81
-
Hybrid Model for Optimisation of Waste Dump Design and Site Selection in Open Pit Mining
Aleksandar Doderovic, Svetozar-Milan Doderovic, Sasa Stepanovic, Mirjana Bankovic, Dejan Stevanovic (2023)Waste management is an unavoidable technological operation in the process of raw material extraction. The main characteristic of this technological operation is the handling of large quantities of waste material, which can amount to several hundred million cubic metres. At the same time, this operation must comply with all administrative and environmental standards. Therefore, optimising waste rock management (particularly haulage and dumping) has the potential to significantly improve the overall value of the project. This paper presents a hybrid ...Aleksandar Doderovic, Svetozar-Milan Doderovic, Sasa Stepanovic, Mirjana Bankovic, Dejan Stevanovic. "Hybrid Model for Optimisation of Waste Dump Design and Site Selection in Open Pit Mining" in Minerals, MDPI AG (2023). https://doi.org/10.3390/min13111401
-
Risk management of machines in open pit mines
Kirin Snežana, Pantelić Milorad, Miljanović Igor. "Risk management of machines in open pit mines" in The Scientific Journal of the Society for Structural Integrity and Life 13 no. 3, -:Društvo za integritet i vek konstrukcija, Beograd (2013): 197-202. https://doi.org/-
-
A Conceptual hydrogeological model for the open pit mine „Polje E“ (Kolubara coal basin, Serbia)
Bajić Dragoljub, Polomčić Dušan (2012)Bajić Dragoljub, Polomčić Dušan. "A Conceptual hydrogeological model for the open pit mine „Polje E“ (Kolubara coal basin, Serbia)" in Proceedings of 9th Symposium GIS Ostrava 2012 - Surface models for geosciences,, Ostrava: (2012): 1-12
-
3D Hydrodinamic model of open pit mine “Polje E” (Kolubara coal basin)
Polomčić Dušan, Bajić Dragoljub (2011)Polomčić Dušan, Bajić Dragoljub. "3D Hydrodinamic model of open pit mine “Polje E” (Kolubara coal basin)" in Proceedings of the V International Conference “Coal 2011”, Zlatibor, Serbia, 19-22 October, 2011, Belgrade:Yugoslav Opencast Mining Committee (2011): 320-330
-
Analysis of attainable technical-technological results work open pit mines electrical industry – EPS of Serbia
Savković Snežana, Majstorović Jelena, Jovančić Predrag. "Analysis of attainable technical-technological results work open pit mines electrical industry – EPS of Serbia" in 5th International Symposium Mining and Environmental protection, Vrdnik-Beograd, Srbija:RGF (2015): 258-261
-
Portion of groundwaters in the floods of western part of open pit Drmno
Milanović Radomir, Polomčić Dušan, Zdravković Jovan, Stoićević Zoran. "Portion of groundwaters in the floods of western part of open pit Drmno" in Pavlović Vladimir, Zlatibor:Jugoslovenski komitet za površinsku eksploataciju (2015): 213-218
-
Hydrodynamic model of the open-pit mine “Buvač” (Republic of Srpska)
Polomčić Dušan, Bajić Dragoljub, Papić Petar, Stojković Jana. "Hydrodynamic model of the open-pit mine “Buvač” (Republic of Srpska)" in Journal of Sustainable Development of Energy, Water and Environment Systems (JSDEWES) 1 no. 3, Zagreb:SDEWES Centre (2013): 260-271
-
Open-pit Filijala northwest slope stabilization in order to reduce damage risk and enviromental protection
Čebašek Vladimir, Gojković Nebojša (2013)Čebašek Vladimir, Gojković Nebojša. "Open-pit Filijala northwest slope stabilization in order to reduce damage risk and enviromental protection" in Podzemni radovi no. 22, Beograd:Univerzitet u Beogradu Rudarsko-geološki fakultet (2013): 49-61
-
Hydrodynamic Model of The Open-Pit Mine “Buvač” (Republic of Srpska, Bosnia And Herzegovina)
Bajić Dragoljub, Polomčić Dušan, Papić Petar, Stojković Jana. "Hydrodynamic Model of The Open-Pit Mine “Buvač” (Republic of Srpska, Bosnia And Herzegovina)" in CD Proceedings of 6th Dubrovnik Conference on Sustainable Development of Energy Water and Environmental Systems,, Dubrovnik: (2011): 25-29
-
Potential traps and risks in slope stability calculations at open pit mines
Vujić Slobodan, Čebašek Vladimir, Gajić Grozdana, Gojković Nebojša, Miljanović Igor, Petrovski Aleksandar (2011)Vujić Slobodan, Čebašek Vladimir, Gajić Grozdana, Gojković Nebojša, Miljanović Igor, Petrovski Aleksandar. "Potential traps and risks in slope stability calculations at open pit mines" in 4th Balkan Mining Congress BALKANMINE 2011, Ljubljana (2011): 527-530
-
Qualification of open pit mines based on external risks assessment
Milutinović Aleksandar, Miljanović Igor, Panić Biljana. "Qualification of open pit mines based on external risks assessment" in Proceedings of the XI Balkan Conference on Operations Research BALCOR, 7-11.09.2013. - no. -, Beograd, Zlatibor, Srbija:University of Belgrade, Faculty of Organizational Sciences, Belgrade (2013): 705-709
-
Multi-variable assessment of risk in selection of location and the way of open pit mines opening
Vujić Slobodan, Hudej Marjan, Miljanović Igor. "Multi-variable assessment of risk in selection of location and the way of open pit mines opening" in Proceedings of the 5th Balkan Mining Congress BALKANMINE 2011, 18-20.10.2013 - no. -, Ohrid, FYR Macedonia:ELEM, University Goce Delcev, Stip (2013): 1-6. https://doi.org/-
-
Factors that influence the selection of an optimal groundwater protection system at open-pit mines
Bajić Dragoljub, Polomčić Dušan, Močević Jelena. "Factors that influence the selection of an optimal groundwater protection system at open-pit mines" in Pavlović Vladimir, Zlatibor:Jugoslovenski komitet za površinsku eksploataciju (2015): 9-16
-
Calculation for the system of wells for protecting the open pit lignite mine Radljevo-North from groundwaters
Šubaranović Tomislav, Polomčić Dušan, Petković Vladimir. "Calculation for the system of wells for protecting the open pit lignite mine Radljevo-North from groundwaters" in Proceedings of the 13th International Symposium Continuous Surface Mining ISCSM 2016, Beograd: (2016)
-
Application of Groundwater modeling for designing a dewatering system: Case study of the Buvač Open Pit Mine, Bosnia and Herzegovina
Polomčić Dušan, Bajić Dragoljub (2015)Polomčić Dušan, Bajić Dragoljub. "Application of Groundwater modeling for designing a dewatering system: Case study of the Buvač Open Pit Mine, Bosnia and Herzegovina" in Geologia Croatica 68 no. 2 (2015): 123-137. https://doi.org/10.4154/GC.2015.07