The rational technology model selection of the underground drivage development for the given conditions
Tokalić Rade, Vidanović Nebojša, Savić Ljubinko. "The rational technology model selection of the underground drivage development for the given conditions" in Underground Mining Engineering no. 23, Belgrade, Serbia:University of Belgrade, Faculty of Mining and Geology (2013): 11-20
-
Odvodnjavanje jame Ćirikovac kao deo sistematskog odvodnjavanja deponije pepela i šljake iz te Drmno-Kostolac B
Mitić Saša, Milojević Dragan, Makar Nenad, Tokalić Rade. "Odvodnjavanje jame Ćirikovac kao deo sistematskog odvodnjavanja deponije pepela i šljake iz te Drmno-Kostolac B" in Podzemni radovi no. 17, Beograd, Srbija:Univerzitet u Beogradu, Rudarsko-geološki fakultet, Beograd (2010): 29-34
-
Prediction of roadheader performance in Serbian underground coal mines
Duško Đukanović, Nemanja Đokić, Rade Tokalić, Luka Crnogorac, Kemal Gutić. "Prediction of roadheader performance in Serbian underground coal mines" in 8th Balkan mining Congress, Belgrade, September 28-30, 2022, Mining Institute Ltd. Belgrade (2022)
-
Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa
Mirjana V. Banković (2018-07-13)Profitabilna eksploatacija sve složenijih ležišta je težak zadatak koji zavisi odtemeljnog procesa analize, planiranja i projektovanja rudnika. Izvodljiv strateškiplan mora da zadovoljava društvena, regulatorna, tehnološka, geometrijska iekonomska ograničenja. Kako bi se postigao osnovni cilj, odnosno profitabilnost iodrživost rudarskog projekta na duži period, neophodno je unapređenjematematičkih modela i informatičke podrške procesima planiranja i optimizacijekoji će omogućiti efikasnu realizaciju ovih ciljeva...tehnološki model, integralni model, planiranje, optimizacija,utovarno-transportni sistem, neto sadašnja vrednost projekta... selektivnih slojeva na etaži. Slaba – otkopavanje od nožice ka vrhu etaže Brzina kretanja Niska – oko 3 - 4 km/h Niska - oko 3 - 4 km/h Visoka - do 35 km/h Preglednost Veoma dobra Dobra Ograničena Dubinski rad Ograničena, izrada rampe Da, sa obrnutom kašikom Ne Radni vek Oko 20. godina Preko 100 ...
... a uglja pa do isporuke uglja termoelektranama. Upravljanje istražnim geološkim podacima i izrada modela ležišta predstavljaju nerazdvojivi deo integralnog koncepta planiranja i skup poslova koji prethode izradi operativnih planova za potrebe optimizacije sistema eksploatacije. U tu svrhu je dat detaljniji ...
... baze Minex modeliranje uključuje: izradu gridova (mreža) krovine i podine ugljenih slojeva, i parametara kvaliteta uglja (DTE, sumpor, pepeo, vlaga, itd), izvoz podataka iz modela u formatu prilagođenom za dalje korišćenje, kao i kontrolu geološkog modela i izradu propratne grafičke dokumentacije. Ovome ...Mirjana V. Banković. "Optimizacija utovarno-transportnih sistema u funkciji planiranja površinskog kopa" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2018-07-13)
-
Optimal determination of the of underground rooms technology model for given conditions
Tokalić Rade, Ganić Aleksandar, Milutinović Aleksandar, Mitić Saša. "Optimal determination of the of underground rooms technology model for given conditions" in PODEKS ’11 – V stručno sovetuvanje na tema Tehnologija na podzemna eksploatacija na mineralni sirovini 1, Makedonska Kamenica:Sojuz na rudarskite i geološkite inženeri na Makedonija (2011): 27-35
-
Contribution to Determiing Harmless Distancewhile Blasting at Facility Podbukovi – Valjevo
Trajković Slobodan, Lutovac Suzana, Damnjanović Vesna, Ravlić Marina. "Contribution to Determiing Harmless Distancewhile Blasting at Facility Podbukovi – Valjevo" in IV internacionalni naučno-stručni skup građevinarstvo nauka i praksa, Zbornik radova, Žabljak, Crna Gora :Univerzitet Crne Gore Građevinski fakultet (2012): 1007-1014
-
Model of selection of longwall roadway drivage technology using fuzzy topsis method
Gligorić Zoran, Tokalić Rade, Beljić Čedomir, Jovanović Saša. "Model of selection of longwall roadway drivage technology using fuzzy topsis method" in Zbornik radova, V međunarodna konferencija – Ugalj 2011 – Zlatibor, 19-22. oktobar 2011., Beograd, Srbija:Jugoslovenski komitet za površinsku eksploataciju (2011): 53-65
-
Analysis of Household Coal Consumption in Serbia Based on Grey System Theory and K - means Clustering (Base for Network Optimization)
Gligorić Zoran, Gligorić Miloš, Štrbac-Savić Svetlana. "Analysis of Household Coal Consumption in Serbia Based on Grey System Theory and K - means Clustering (Base for Network Optimization)" in 1st Virtual International Conference on Science, Niš:Research and Development Center ALFATEC (2015): 45-48
-
Defening of optimal geometry of drilling chisels blade fer led and zinc ore
Savić Ljubinko, Tokalić Rade, Vidanović Nebojša, Trajković Slobodan, Ganić Aleksandar. "Defening of optimal geometry of drilling chisels blade fer led and zinc ore" in Technics Technologies Education Management / TTEM 6 no. 4, Sarajevo, BIH:DRUNPP Sarajevo (2011): 866-875
-
Geometrijska kontrola projekta i određivanje elemenata za obeležavanje transportnog niskopa STN-2a u rudniku boksita Kosturi
Milutinović Aleksandar, Ganić Aleksandar, Tokalić Rade, Gligorić Zoran. "Geometrijska kontrola projekta i određivanje elemenata za obeležavanje transportnog niskopa STN-2a u rudniku boksita Kosturi" in Podzemni radovi no. 17, Beograd:Rudarsko-geološki fakultet, Beograd (2010): 21-28
-
Preliminary Examination of the System Fly Ash–Bottom Ash–Flue Gas Desulphurization Gypsum–Portland Cement–Water for Road Construction
Tokalić Rade, Marinković Slobodanka, Trifunović Prvoslav, Dević Gordana, Zildzović Snežana. "Preliminary Examination of the System Fly Ash–Bottom Ash–Flue Gas Desulphurization Gypsum–Portland Cement–Water for Road Construction" in Journal of Chemistry, :Hindawi Publishing Corporation (2013). https://doi.org/doi:10.1155/2013/421480
-
Examination of the possibilities of the application of waste materials (gypsum, fly ash and bottom ash) in construction
Trifunović Prvoslav, Marinković Slobodanka, Kostić-Pulek Aleksandra, Tokalić Rade, Popov Svetlana (2014)Trifunović Prvoslav, Marinković Slobodanka, Kostić-Pulek Aleksandra, Tokalić Rade, Popov Svetlana. "Examination of the possibilities of the application of waste materials (gypsum, fly ash and bottom ash) in construction" in Podzemni radovi no. 24, Beograd:Rudarsko-geološki fakultet (2014): 49-60
-
The effect of the content of unburned carbon in bottom ash on its applicability for road construction
Trifunović Prvoslav, Marinković Slobodanka, Tokalić Rade, Matijašević Srdjan. "The effect of the content of unburned carbon in bottom ash on its applicability for road construction" in Тhermochimica Acta, 20 January 2010 498 no. 1–2, Amsterdam, Netherlands:Elsevier BV (2010): 1-6. https://doi.org/10.1016/j.tca.2009.10.022
-
Defining of optimal geometry of drilling chisels blade for Led and Zinc ore
Savić Ljubinko, Tokalić Rade, Vidanović Nebojša, Trajković Slobodan, Ganić Aleksandar. "Defining of optimal geometry of drilling chisels blade for Led and Zinc ore" in Technics Technologies Education Management / TTEM 7 no. 4, Sarajevo, Bosnia & Herzegovina:DRUNPP, Sarajevo (2011): 866-875
-
Rock Stability Analysis On The Model Of Designed And Constructed Roadways In The Jama Bor
Zlatanović Dragan, Milisavlјević Vladimir, Tokalić Rade, Čebašek Vladimir. "Rock Stability Analysis On The Model Of Designed And Constructed Roadways In The Jama Bor" in Underground Mining Engineering - Podzemni radovi no. 26, :Univerzitet u Beograd - Rudarsko-geološki fakultet (2015): 35-47
-
Optimal Coal Supplier Selection for Thermal Power Plant Based on Mcrat Method
Miloš Gligorić, Katarina Urošević, Suzana Lutovac, Dževdet Halilović. "Optimal Coal Supplier Selection for Thermal Power Plant Based on Mcrat Method" in eNergetics 2021, Mathematical Institute of the Serbian Academy of Sciences and Arts, Belgrade, Serbia (2021)
-
Hidrotermalne alteracije kao kontrolni faktor mineralizacije u ležištu bakra Borska reka
Jovana Mirčeta (2024)Rudno polje Bor kome pripada rudno telo Borska reka se nalazi u severnom delu Borsko- Srednjegorske zone Karpato-balkanske metalogenetske provincije. Ležište Borska Reka se nalazi u krajnjim severozapadnim delovima rudnog polja Bor. Smešteno je u intenzivno izmenjenim andezitima i njihovim piroklastitima. Relativno je jednostavne građe. Ležište Borska reka genetski pripada grupi hidrotermalnih ležišta, klasi porfirskih ležišta bakra i zlata. Sastavni je deo velikog hidrotermalnog rudonosnog sistema Bor, koji je po uslovima stvaranja i tipovima rudne mineralizacije sličan hidrotermalnom rudonosnom ...... sastav ı na samim uzorcima obeležen pravac sečenja u cilju izrade preparata. Svi uzorci su fotografisani u cilju dokumentovanja nakon čega Je izvršena izrada preparata. 2. _ U drugoj fazi izvršena Je izrada petroloških preparata. Izrada preparata obuhvata sledeće korake (Pačevski, 2018.): Sečenje ...
... interpretaciju dobijenih rezultata. Tom prilikom korišćena Je stručna literatura, naučni radovi, kao i internet podaci koji su bili značajni pri samoj izradi master rada. 25 4. REZULTATI Prikaz rezultata obuhvata sumiranje, poređenje ıi interpretaciju analiza makroskopskih uzoraka, petroloških uzoraka ...
... fiju, petrologiju i geohemiju, kao i katedri za Ekonomsku geologiju koja mi je dozvolila korišćenje instrumenata, koji si mi bili neophodni za izradu master rada. Zahvaljujem se kompaniji Srbija Zijin Copper koja mi je omogućila korišćenje podataka i dozvolila uzimanje uzoraka iz bušotine. ...Jovana Mirčeta. Hidrotermalne alteracije kao kontrolni faktor mineralizacije u ležištu bakra Borska reka, 2024
-
Opening and development of the subhorizont at a level of 20m in mine Veliki Majdan - Ljubovija, Republic of Serbia
Mitić Saša, Milojević Dragan, Makar Nenad, Tokalić Rade. "Opening and development of the subhorizont at a level of 20m in mine Veliki Majdan - Ljubovija, Republic of Serbia" in Zbornik na trudovi PODEKS ’11 - V stručno sovetuvanje na tema: Tehnologija na podzemna eksploatacija na mineralni surovini – Makedonska Kamenica, 11-12.11.2011. 1, Makedonska Kamenica:Sojuz na rudarskite i geološkite inženeri na Makedonija (2011): 60-65
-
Analysis of the impact of blasting on construction facilites and environment in the preparation of the tunnel portal Sarlah near Pirot (south Serbia)
Ravilić Marina, Bogdanović Bojana, Lutovac Suzana, Bajić Sanja, Gaćina Radmila. "Analysis of the impact of blasting on construction facilites and environment in the preparation of the tunnel portal Sarlah near Pirot (south Serbia)" in XXIII International Conference „ECOLOGICAL TRUTH“ ECO-IST15, Kopaonik, Serbia, :University of Belgrade – Technical Faculty in Bor (2015): 212-217
-
Evaluation of Underground Zinc Mine Investment Based on Fuzzy-Interval Grey System Theory and Geometric Brownian Motion
Gligorić Zoran, Kričak Lazar, Beljić Čedomir, Lutovac Suzana, Milojević J.. "Evaluation of Underground Zinc Mine Investment Based on Fuzzy-Interval Grey System Theory and Geometric Brownian Motion" in Journal of Applied Mathematics, :Hindawi Publishing Corporation (2014)