Effectiveness Analysis of Different Bucket-wheel Excavators
Coal production in open-pit lignite mines in the Republic of Serbia is performed with continuous work systems. In addition to coal production, the same systems are used for the exploitation of large quantities of overburden. According to the reliability concept, continuous systems are in linear connection. If the failure occurs in one part of the system, that will produce a downtime of the entire system. The initial and most important factor of continuous systems is the bucket-wheel excavator. It ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Miloš Tanasijević, Filip Miletić. "Effectiveness Analysis of Different Bucket-wheel Excavators" in 8th International Conference Mining and Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model
The Majdanpek open pit mine south district is currently active mining prospect of copper ore exploitation in eastern Serbia. Its depth is approaching the termination depth and occurrences of large-scale instabilities and global instability of the final pit slope is possible. These can generate catastrophic mass movement inside an area that encloses a regional road route and the Pek River bed which is channelled along the outer contour of the pit. The displacements that were noted in early 2023, in the ...Miloš Marjanović, Stefan Milanović, Nikola Simić, Lazar Kričak. "Failure Estimation of the Majdanpek Open Pit East Face Based on Inverse Velocity Model" in Regional Symposium on Landslides in the Adriatic-Balkan Region, Belgrade, 15-18th May 2024, University of Belgrade, Faculty of Mining and Geology (2024). https://doi.org/10.18485/resylab.2024.6.ch46
-
Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines
The conditions under which contemporary surface mining operations is carried out obviously becoming increasingly complex. In such complex conditions, the optimization of haulage systems as the technological phase with the largest share in the total operating costs, is very important from the aspect of achieving profitability of the mining project. In a large number of cases, the application of traditional haulage systems with trucks (as the most dominant type of haulage in open pit mines) does not lead to ...Ali Nasirinezhad, Dejan Stevanović, Dragan Ignjatović, Petar Marković. "Overwiew of In-Pit Crushing & Conveying Technology in Open Pit Mines" in 8th International Conference MIining And Environmental Protection, Sokobanja, 22-25 September 2021, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia
With the creation of a hydrodynamic model, the need for it usually ceases until some next moment when the model needs to be updated and used for the set task for the necessary project documentation or dedicated studies. It is relatively rare that almost every year the model is improved and used for forecast calculations. The paper presents the basic characteristics and development of the hydrodynamic model of the open pit mine “Drmno” for 25 years. This open pit ...Dušan Polomčić, Jelena Ratković, Vesan Ristić Vakanjac. "History of the development of the hydrodynamic model of the open pit mine “Drmno”, Serbia" in National Conference with International Participation “GEOSCIENCES 2023”, Review of the Bulgarian Geological Society , Sofia : Bulgarian Geological Society (2023)
-
A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach
Nikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović (2024)This study presents a unique model for assessing the dependability of continuous parts of combined systems in open-pit mining through the application of fuzzy logic. Continuous sub-systems as part of the combined system of coal exploitation in surface mines have the basic function of ensuring safe operation, high capacity with high reliability, and low costs. These subsystems are usually part of the thermal power plant’s coal supply system and ensure stable fuel supply. The model integrates various independent partial ...fuzzy logic, max-min composition, continuous part of combined system (CCS), open pit, mining, dependabilityNikola Stanić, Miljan Gomilanović, Petar Marković, Daniel Krzanović, Aleksandar Doderović, Saša Stepanović. "A Model for Determining the Dependability of Continuous Subsystems in Coal Mines Using the Fuzzy Logic Approach" in Applied Sciences, Basel, August 2024, MDPI (2024). https://doi.org/https://doi.org/10.3390/app14177947
-
The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers
One of the most important prerequisites for the successful operation of the open-cast lignite mine is to carry out all the auxiliary works timely with the necessary quality. The most important and most commonly used auxiliary machines are bulldozers. Engaging time of bulldozers use is in direct relation with the coefficients of the time and capacity utilization of the continuous system for the excavation of coal and tailings, which indicates their importance. More than 100 bulldozers have been hired ...... that machihe. Keywords: Open-cast coal mine, auxiliary works, bulldozers, optimization, availabilifty. 1. INTRODUCTION Dozers are most common auxiliary machines at open-cast coal mines, both by type and the scope of tasks these machines can be used for. In the open-cast lignite mines of Electric ...
... 2011-2019. REFERENCES 1. Optimizing organization, resources and costs of auxiliary mechanization to increase utilization of overburden and coal systems on open pit mines of EPS (in Serbian) (2018) Study, Faculty of Mining and Geology, Belgrade 2. Jovantié, P. Maintenance of mining machines (in Serbian) ...
... years, 50 И is hecessary 10 replace тће complete equipmeht several times тт the lifetime ој the mine. The purchasing and the operational costs of auxiliary machihnes are high, and тп the 10141 cost of coal excavating mehtioned cost are fFom about 1.5-2 6 АП this points to the importance of choosihng ...Dragan Ignjatović, Predrag Jovančić, Stevan Đenadić, Ivan Janković, Ivica Ristović. "The optimization of auxiliary machinery in open-cast lignite mines: a case study of bulldozers" in 7th International Symposium Mining and Environmental Protection, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2019)
-
Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining
Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović (2019)... continuous (twenty-four hours a day) production and to excavate the planned amount of ore and overburden in an open-cast coal mine, it is necessary to achieve optimal working conditions. The operational efficiency of the basic (continuous) machinery is in a direct correlation with the work of the auxiliary ...
... (discontinuous) machinery, whose role is to accomplish all of the auxiliary workings on time. In effect, in the process of production in an open-cast coal mine, there must always be several different auxiliary machines available. The absence or insufficient number of the adequate auxiliary machinery ...
... method of evaluation is supposed to show the connection between the characteristics of the machines and the exact working conditions in the open-cast coal mine, leading to the right choice of machine in relation to those conditions. Energies 2019, 12, 2245; doi:10.3390/en12122245 www.mdpi.com/journ ...Ivan Janković, Stevan Đenadić , Dragan Ignjatović , Predrag Jovančić , Tomislav Šubaranović, Ivica Ristović . "Multi-Criteria Approach for Selecting Optimal Dozer Type in Open-Cast Coal Mining" in Energies, MDPI (2019). https://doi.org/https://doi.org/10.3390/en12122245
-
Analiza geomehaničke stabilnosti kosina na odlagalištima i površinskom kopu Ćeramide
Kako bi se nastavila eksploatacija dacita na površinskom kopu Ćeramide kod Rudnika, potrebno je izraditi novu projektnu dokumentaciju na osnovu novih overenih rezervi. Da bi se eksploatacija jalovine i dacita odvijala sigurno bez klizanja i obrušavanja stenskog materijala, neophodno je izvršiti proveru stabilnosti projektovanih kosina i na odlagalištima i na samom površinskom kopu. U ovom radu je upravo data analiza geomehaničke stabilnosti kosina na odlagalištima i površinskom kopu dacite Ćeramide kod Rudnika.Tomislav Šubaranović, Vladimir Čebašek, Bojan Dimitrijević, Veljko Rupar. "Analiza geomehaničke stabilnosti kosina na odlagalištima i površinskom kopu Ćeramide" in XV Međunarodna konferencija OMC 2022, Zlatibor, 12-15. oktobar 2022., Jugoslovenski komitet za površinsku eksploataciju (2022)
-
Optimizacija i planiranje površinskih kopova stohastičkim modelima
Dejan R. Stevanović (2015-05-29)Savremeno rudarstvo izloženo je stalnom trendu pogoršanja uslova poslovanja.Mogućnost ostvarenja ekonomskih i drugih ciljeva rudarskog projektakompromitovana je stalnim pogoršanjem kvaliteta ležišta na kojima se vršieksploatacija, kao i značajnoj dozi neizvesnosti povezane sa geološkim,ekonomskim i tehničkim parametrima proizvodnje. U ovako kompleksnimuslovima poslovanja, matematički modeli sposobni da odgovore značajnimizazovima, odnosno ponude optimalna rešenja kojima se garantuje maksimalnoispunjenje projektovanih ciljeva, nameću se kao neophodnost.Trenutni, konvencionalni pristup optimizaciji i planiranju površinskih kopovazasniva se na algoritmima, razvijenim sredinom prošlog veka čije je opšteobeležje deterministički ...površinski kop, planiranje, optimizacija, stohastički modeli, kontrola kvaliteta uglja, neizvesnost.... on the lignite open pit. Second model that is being developed is hybrid type. It has stochastic (Monte Carlo method) and deterministic component and treats the problem of optimization of open pit boundaries. Keywords: open pit mine, planning, optimization, stochastic models, coal quality control ...
... of waste transportation system for open pit Buvač, Tehnika, Beograd Mario, J. M, Salma, J, P, 1973, Ore Reserve Education and Open Pit Planning, X-ti APCOM, Johanesburg, South Africa Martinez, L. A. 2003. Can quantification of geological risk improve open pit mine design? MPhil, In Academic. DepartmentThe ...
... stohastičkim modelima;Open pit mine optimization and planning with stochastic models Dejan R. Stevanović Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Optimizacija i planiranje površinskih kopova stohastičkim modelima;Open pit mine optimization and planning ...Dejan R. Stevanović. "Optimizacija i planiranje površinskih kopova stohastičkim modelima" in Универзитет у Београду, Универзитет у Београду, Рударско-геолошки факултет (2015-05-29)
-
Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic
This work presents a model for determining the availability of continuous systems at open pits by applying fuzzy logic and fuzzy inference systems. The applied model was formed by the synthesis of independent partial indicators of availability. The model is based on an expert system for assessing the availability of continuous mining systems. The availability of the system, as a complex state parameter, is decomposed into the partial indicators, reliability, and convenience of maintenance, and the fuzzy compositions, used ...системи, континуални систем експоатације, површински коп, рударство, расположивост, фази логика, max–min композиција, min–max композицијаMiljan Gomilanović, Miloš Tanasijević, Saša Stepanović. "Determining the Availability of Continuous Systems at Open Pits Applying Fuzzy Logic" in Energies, MDPI AG (2022). https://doi.org/10.3390/en15186786
-
Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja
Hidraulični bageri primenjuju se u različitim oblastima privrede a najzastupljeniji su u građevinarstvu i rudarstvu. Na površinskim kopovima sa kontinualnim sistemima, klasifikuju kao pomoćna mehanizacija a na površinskim kopovima sa diskontinualnim sistemima, kao osnovna mehanizacija. Kako je u oba slučaja njihova primena neizostavna, važno je izvršiti adekvatnu analizu postojećih podataka, u cilju optimizacije izbora tipa hidrauličnog bagera u odnosu na uslove rada datog površinskog kopa. U radu su opisane različite višekriterijumske metode koje su korišćene za analizu hidrauličnih bagera. ...... 2010. [8] Bescetin A, A decision support system using analy- tical hierarchy process (AHP) for the optimal envoi- rmental reclamation of an open-pit mine. Eviron- mental Geology, 52, pp. 663-672. 2007. [9] Mohamadibadi H S, Tichkowsky G, Kumar, A. De- velopment of a Multi-Criteria Assessment Model ...
... the quality of output information which can affect the future purchasing decisions of this machinery. Key words: multi-criteria methods, open-cast coal mine, auxiliary machines, hydraulic excavators. https://doi.org/10.1016/j.procs.2015.07.081 https://doi.org/10.1016/j.procs.2015.07.081 ...
... OF HYDRAULIC EXCAVATORS ON OPEN-CAST COAL MINING Hydraulic excavators are used in different areas of industry, most often in construction and mining. On open-cast coal mines with continuous systems, they are classified as auxiliary machinery, while on open- cast coal mines with discontinuous systems ...Stevan Đenadić, Predrag Jovančić, Dragan Ignjatović, Filip Miletić, Ivan Janković. "Analiza primene višekriterijumskih metoda u optimizaciji izbora hidruličnih bagera na površinskim kopovima uglja" in Tehnika, Centre for Evaluation in Education and Science (CEON/CEES) (2019). https://doi.org/10.5937/tehnika1903369D
-
Application of stochastic models for mine planning and coal quality control
... stochastic models for mine planning and coal quality control Dejan Stevanović, Božo Kolonja, Ranka Stanković, Dinko Knežević, Mirjana Banković Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Application of stochastic models for mine planning and coal quality control ...
... plants or to stockyards. Because coal properties can vary con- siderably, the quality of run of mine (ROM) coal composite will depend on both the quality and quantity of coal mined from each active bench. If it is desired to control the ROM coal quality, the rate of coal production from each active bucket ...
... operational mine planning or stocking process, since the dispersion characteris- tics of the original data are maintained. Coal quality control at the mine planning phase Mine planning is based on reliable estimates of coal grades of future mining blocks. Consequently, in order to develop any coal quality ...Dejan Stevanović, Božo Kolonja, Ranka Stanković, Dinko Knežević, Mirjana Banković. "Application of stochastic models for mine planning and coal quality control" in Thermal Science, Belgrade : Vinča Institute of Nuclear Sciences (2014). https://doi.org/10.2298/TSCI130201031S
-
Improving efficiency of thermal power plants through mine coal quality planning and control
Главни циљ контроле квалитета угља у рудницима лигнита је снабдевање термоелектрана угљем чији квалитет мора да се креће унутар одређених квалитативних ограничења. Карактеристике угља могу да утичу на ефикасност, поузданост и расположивост како котла тако и јединица за контролу емисије. У овом раду аутори су презентовали интегрисану симулацију рударског процеса као нови приступ у истраживању променљивости калоричне вредности угља приликом експлоатације комплексног лежишта лигнита. Резултати таквог приступа омогућавају драгоцен увид у перформансе континуалног рударског система у смислу контроле променљивости ...Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja. "Improving efficiency of thermal power plants through mine coal quality planning and control" in Thermal Science, Vinča Institute of Nuclear Sciences (2018). https://doi.org/10.2298/TSCI170605209B
-
Approach to operational mine planning: Case study Tamnava West
... scheme of open pit Tamnava West is presented on Figure 1. Figure 1. General technological scheme of open pit Tamnava West 2.1. Developing of technological model for coal quality control Minex is the recognized as one of world leading software for integrated geology and mine planning ...
... conducted on open pit Tamnava West field. Successful operational mine planning is almost impossible without use of modern software packages. For that reason in presented case study operational mine planning is done with Minex software. Key words: operational planning, geological modeling, coal quality ...
... with problems that are unique for specific open pit mine. Good example of custom made software is SUKU, software package developed on Faculty for Mining and Geology (Belgrade) with specialized tools for coal quality control management in a coal mines with continuous technology. Ackn ...Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
Conversion of land areas after coal mine closure and reclamation
Otkopavanje uglja površinski i podzemno praćeno je degradacijom zemljišta, promenom formiranja predela i izmenom flore i faune. Od velikog značaja je razvoj novih naučno utemeljenih pristupa obnovljanje antropogeno poremećenih predela zasnovanih na formiranju rekultivacionih i rudarskih tehnologija. Apsolutno je neophodno obezbediti sveobuhvatno kvalitetno očuvanje zemljišnih i vodnih resursa i odrediti rekultivisano zemljište za novu namenu. U ovom članku je dat pregled najpopularnijih metoda rekultivacije zemljišta i mogućnosti rekultivacije zemljišta nakon završetka rekultivacije i zatvaranja rudnika uglja.... operate in the coal mine rehabilitated land may get easier and faster because generally there is no public opposition and no competition with agricultural activities. Figure 3 shows Photovoltaic panels in Boortai Coal Mine in China (left) [11], solar plant in Klettwitz former open pit mine, Brandenburg ...
... Photovoltaic panels in Boortai Coal Mine in China (2022) on left side, solar plant in Klettwitz, Germany on right side One of the most prominent environmental engineering issues facing Drmno in recent years is the need to rehabilitate and reallocate a former coal open pit mine. Fortunately, new technologies ...
... the comprehensiveness and applicability of multi- criteria methods for choosing the purpose of recultivated terrain after the closure of an open-pit coal mine. The crucial point seems to be the know-how transfer into reclamation practice - implementing:concrete solutions and site-adapted decision ...Radmila Gaćina, Bojan Dimitrijević, Sanja Bajić. "Conversion of land areas after coal mine closure and reclamation" in 9th International conference mining and environmental protection MEP 23 Proceedings, Sokobanja, 24-27.05.2023., Belgrade : University of Belgrade - Faculty of mining and geology (2023)
-
A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)
... 389-396. A hydrogeological model of the open-cast mine… 53 POLOMČIĆ, D. and BAJIĆ, D. (2011). 3D Hydrodinamic model of open pit mine “Polje E” (Kolubara coal basin). In: PAVLOVIĆ, V. (ed.) Proceedings of the V International Conference “Coal 2011”. Zlatibor, Serbia, 19-22 October, 2011. Belgrade: ...
... OI176022, TR33039, TR37005 and III43004. REFERENCES BAJIĆ, D. and POLOMČIĆ, D. (2012) A conceptual hydrogeological model for open pit mine „Polje E“ (Kolubara coal basin, Serbia). In: RŮŽIČKA, J. and RŮŽIČKOVÁ, K. (eds.) Proceedings of the GIS Ostrava 2012 - Surface models for geosciences symposium ...
... 320-330. POLOMČIĆ, D., BAJIĆ, D. and RISTIĆ-VAKANJAC, V. (2012) Groundwater balance, natural recharge and drainage zones at open pit mine „Polje E“ of Kolubara Coal Basin (Republic of Serbia). In: BAN, M., et al. (eds.) CD Proceedings of the 7th Conference on Sustainable Development of Energy ...Jelena Ratković, Dušan Polomčić, Dragoljub Bajić, Bojan Hajdin. "A hydrogeological model of the open-cast mine Tamnava - West Field (Kolubara Coal Basin, Serbia)" in Underground Mining Engineering no. 29, Belgrade : University of Belgrade - Faculty of mining and geology (2016): 43-54
-
An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System
In this paper we describe the approach that has been used in the development of the Management Information System (MIS) in the Coal Mine Pljevlja in Montenegro. The methodology of this approach was based on new information technologies and management techniques which have already been successfully applied in other related fields. Its main goal was to introduce modern management techniques to mining, adapted to specific features of the mining industry, its operations and environment, thus enabling the tactical management ...... of TIS as a starting point for the construction of an e-mine. This figure shows two open pits, but if new sites and production complexes are opened, they can also be included in the system. Figure 1. Architecture of TIS for Coal Mine Pljevlja 2.1 Human resources The human resources system ...
... data. For example, production by each production unit can be rolled up to production by type of equipment and further can be rolled up to open pit, or the whole mine, aggregated for specified period, by products (figure 5). In drilldown reports, OLAP can go in the reverse direction and automatically ...
... Faculty of Mining and Geology archives faculty publications available in open access, as well as the employees' publications. - The Repository is available at: www.dr.rgf.bg.ac.rs An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System Božo Kolonja1, Ranka Stanković1 ...Božo Kolonja, Ranka Stanković, Filip Vuković, Ivan Obradović. "An Approach to Management Decision Support: The Coal Mine Pljevlja Management Information System" in Proceedings of the Fifteenth International Symposium on Mine Planning and Equipment Selection, Torino, Italy, September 2006, Vol. 1,, Balkema (2006)
-
Production information system of the Pljevlja coal mine
Božo Kolonja, Ranka Stanković, Filip Vuković . "Production information system of the Pljevlja coal mine" in Mine Planning and Equipment Selection 2000, Routledge (2018). https://doi.org/10.1201/9780203747124-154
-
Evaluation And Perspectives Of Underground Coal Mines In Serbia
... operation (Soko, Strmosten pit in REMBAS mine, Lubnica and Štavalj) and for closure of those mines without potential (Tadenje and Jarando pits of Ibarski mines, Senjski rudnik pit of REMBAS, Bogovina and Vrška Čuka). This approach leaves Jasenovac mine and Block IV pit of REMBAS mine in between these ...
... non-producing mine whose workers are hired as contractors in other mines. These mines are dispersed throughout Serbia, and they are producing various types of coal, as given in Table 1. Table 1. Mines, location, type of coal produced and number of workers (as of March, 2017) Mine Town / Municipality ...
... major coal producers in Europe, with over 38 Mt of coal per year. But most of this production is achieved in lignite open cast mines, which in 2016 produced 37.6 million tonnes [1]. On the other hand, combined production of all underground coal mines in Public Company for Underground Coal Exploitation ...Vladimir Milisavljević, Milena Lekić, Ivica Ristović, Vojin Čokorilo, Aleksandar Cvjetić. "Evaluation And Perspectives Of Underground Coal Mines In Serbia" in 7th Balkan Mining Congress Preceedings - BalkanMine2017, Prijedor, 11-13. oktobar 2017., Banjaluka : University of Banjalika, Faculty of Mining, RS, BiH (2017)
-
Natural and geological conditions of coal mining in the pits of the brown coal mine Rembas - Resavica
Bugarin Mile, Ivković Mirko, Ljubojev Milenko, Ljubojev Vesna, Rakić Dragoslav. "Natural and geological conditions of coal mining in the pits of the brown coal mine Rembas - Resavica" in Technics Technologies Education Management / TTEM 7 no. 2, Sarajevo, BIH:DRUNPP Sarajevo (2012): 673-678