Претрага
811 items
-
Imputing missing data using grey system theory and the biplot method to forecast groundwater levels and yields
Groundwater management is one of today’s important tasks. It has become necessary to seek out increasingly reliable methods to conserve groundwater resources. Dependable forecasting of the amounts of groundwater that can be abstracted in a sustainable manner requires longterm monitoring of the groundwater regime (rate of abstraction and groundwater levels). Monitoring of the groundwater source for the town of Bečej, Serbia had been disrupted for multiple years. The objective of the paper is to assess the possibility of reinterpreting ...Jelena Ratković, Dušan Polomčić, Zoran Gligorić, Dragoljub Bajić. "Imputing missing data using grey system theory and the biplot method to forecast groundwater levels and yields" in Geologia Croatica, Hrvatski geološki institut (2022). https://doi.org/10.4154/gc.2022.14
-
Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection
When considering data and parameters in hydrogeology, there are often questions of uncertainty, vagueness, and imprecision in terms of the quantity of spatial distribution. To overcome such problems, certain data may be subjectively expressed in the form of expert judgment, whereby a heuristic approach and the use of fuzzy logic are required. In this way, decision-making criteria relating to an optimal groundwater control system do not always have a numerical value. Groundwater control scenarios (alternatives) are identified through hydrodynamic ...expert judgment, linguistic variables, fuzzy dynamic TOPSIS, hydrogeology, groundwater control system, open-cast mine, geometric Brownian motionDušan Polomčić, Zoran Gligorić, Dragoljub Bajić, Miloš Gligorić, Milanka Negovanović. "Multi-Criteria Fuzzy-Stochastic Diffusion Model of Groundwater Control System Selection" in Symmetry, MDPI AG (2019). https://doi.org/10.3390/sym11050705
-
Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia
Dragoljub Bajić, Dušan Polomčić (2014)A groundwater control system was designed to lower the water table and allow the pumping sta-tion “Bezdan 1” to be built. Based on a hydrodynamic analysis that suggested three alternative solutions, mul-ticriteria optimization was applied to select the best alternative. The fuzzy analytic hierarchy process methodwas used, based on triangular fuzzy numbers. An assessment of the various factors that influenced the selec-tion of the best alternative, as well as fuzzy optimization calculations, yielded the “weights” of the alternativesand the ...groundwater lowering, groundwater management scenario, fuzzy analytic hierarchy process,expert knowledge, triangular fuzzy numbers, linguistic variablesDragoljub Bajić, Dušan Polomčić. "Fuzzy optimization in hydrodynamic analysis of groundwater control systems: Case study of the pumping station “Bezdan 1”, Serbia" in Geološki anali Balkanskoga poluostrva, Belgrade : University of Belgrade - Faculty of mining and geology (2014). https://doi.org/10.2298/GABP1475103B
-
A Teamwork-Based Protocol for a Holistic Approach to Selecting a Sustainable Mine Dewatering Management Plan
znanje eksperta, podzemne vode, primenjena matematika, fazi optimizacija, strategija održivog upravljanja, holistički sistemDragoljub Bajić, Sanja Bajić, Jelena Trivan, Ljubica Figun, Jelena Milovanović. "A Teamwork-Based Protocol for a Holistic Approach to Selecting a Sustainable Mine Dewatering Management Plan" in Sustainability , MDPI (2024)
-
Design and drilling of wells in formations with high pressure
Vojin Solomun (2024)Objectives of this Thesis are to: - Develop an awareness of the challenges presented from elevated temperatures and pressures in well construction. - Learn the key differences between ―normal‖ condition wells and HPHT wells. - Understand some of the indicators of thermal- and pressure-related problems. - Understand the responses which may be made to mitigate high pressure and high temperature ,,HPHT‘‘ challenges while drilling wells. HPHT wells are an unavoidable consequence of the ever expanding search for oil and gas resources around the world. As wells are ...... manifold (NExT, 2016.) Choke Control - The EFC Advanced Choke Control System for dual remote choke control (picture 7.8), incorporates a well control system to assist decision-making during critical incidents. The choke control generates hydraulic power for control of additional overboard valves ...
... (Casrg sheor ram Welrez Picture 7.4 – Subsea BOP stack (Rees) 62 BOP Control System -– The requirements for the BOP & ESD control system must be established (picture 7.5), including the need for remote control points (e.g. at lifeboat stations). Picture 7.5 — Remote panel bulbs and Koomey ...
... valves. Finescale Gauge Set lLiqud Seal Monitor Overboard VaMe Control- Manual Choke & Kill ___ Valve Indicators Choke Control Picture 7.8 – Advanced choke control (EFC Group [Online]) 7.3 Kill System Kill Pump - A 1035 bar kill pump capable of slow circulation rates at +/- 0.0795 m“/min ...Vojin Solomun. Design and drilling of wells in formations with high pressure, 2024
-
Improving efficiency of thermal power plants through mine coal quality planning and control
Главни циљ контроле квалитета угља у рудницима лигнита је снабдевање термоелектрана угљем чији квалитет мора да се креће унутар одређених квалитативних ограничења. Карактеристике угља могу да утичу на ефикасност, поузданост и расположивост како котла тако и јединица за контролу емисије. У овом раду аутори су презентовали интегрисану симулацију рударског процеса као нови приступ у истраживању променљивости калоричне вредности угља приликом експлоатације комплексног лежишта лигнита. Резултати таквог приступа омогућавају драгоцен увид у перформансе континуалног рударског система у смислу контроле променљивости ...... of the combustion system. The SO2 emission reduction is usually achieved either with the installation of flue gas desulphurization systems or switching to lower sulphur coals. The NOx emissions are reduced by combustion modifications or the installation of NOx abatement and control systems. The interactions ...
... planning and control Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja Дигитални репозиторијум Рударско-геолошког факултета Универзитета у Београду [ДР РГФ] Improving efficiency of thermal power plants through mine coal quality planning and control | Mirjana ...
... 2298/TSCI170605209B The main goal of coal quality control in lignite mines is to supply coal to power plants within certain quality constraints. Coal properties can affect the efficiency, reliability, and availability of both the boiler and the emission control units. This paper presents a new based integrated ...Mirjana Banković, Dejan Stevanović, Milica Pešić, Aleksandra Tomašević, Ljiljana Kolonja. "Improving efficiency of thermal power plants through mine coal quality planning and control" in Thermal Science, Vinča Institute of Nuclear Sciences (2018). https://doi.org/10.2298/TSCI170605209B
-
Production information system of the Pljevlja coal mine
... operations sometimes exceed 50% of the total mine’s budget, control of this costs is an important aspect of mine managment. An effective cost control program must include up- to-date feedback and analysis of expenditures. A work order system is the most common means of capturing the various costs as ...
... contains all data related to transportation and maitenance costs. 2 SYSTEM OVERVIEW The Production information system (PIS) is a set of integrated computer modules which comprise a comprehensive methodology for control of production, maintenance and materials management activities, and for ...
... equipment utilization and other functional areas of the minesite, an integrated approach to the monitoring and control of production costs is essential. To achieve this goal, the information system must provide information to support the mine management in reaching the following objectives: (1) establishing ...Božo Kolonja, Ranka Stanković, Filip Vuković . "Production information system of the Pljevlja coal mine" in Mine Planning and Equipment Selection 2000, Routledge (2018). https://doi.org/10.1201/9780203747124-154
-
Sequential Blasting Initiation System with Wireless RF Control (SBIS - WRF)
Kričak Lazar, Bogunović Dragan, Teodorović Zoran. "Sequential Blasting Initiation System with Wireless RF Control (SBIS - WRF)" in Proceedings of the 34th Annual Conference on Explosives and Blasting Technique 2, Cleveland, Ohio :International Society of Explosives Engineers (2008): 265-272
-
Multi-criteria decision analysis for the purposes of groundwater control system design.
Bajić Dragoljub, Polomčić Dušan, Ratković Jelena. "Multi-criteria decision analysis for the purposes of groundwater control system design." in Water Resources Management 15 no. 31, :Springer (2017): 4759-4784. https://doi.org/10.1007/s11269-017-1777-4
-
Determining the optimal groundwater control system using Fuzzy-GWCS® application
Bajić Dragoljub, Polomčić Dušan, Dašić Tina, Ratković Jelena, Čokorilo Ilić Marina. "Determining the optimal groundwater control system using Fuzzy-GWCS® application" in Proceedings of the VIII International Conference “Coal 2017”, Belgrade:Yugoslav Opencast Mining Committee (2017): 9-16
-
Application of the system for dust control on the haulage roads on example of open pit Buvač
Vukelja Željko, Tošić Dražana, Negovanović Milanka. "Application of the system for dust control on the haulage roads on example of open pit Buvač" in Proceedings of the 7th Balkan Mining Congress BALKANMINE 2017 1 no. 7, Prijedor, Republic of Srpska:University of Banja Luka Faculty of Mining Prijedor, Mining Institute Belgrade Ltd (2017): 367-375. https://doi.org/10.7251/BMC170701367V
-
Application of the VIKOR and FAHP multi-criteria optimisation methods for choosing the optimal groundwater control system: case of pumping station Bezdan 1 (Serbia)
Bajić Dragoljub, Polomčić Dušan, Ristić Vakanjac Vesna, Ratković Jelena, Čokorilo Ilić Marina (2017)Bajić Dragoljub, Polomčić Dušan, Ristić Vakanjac Vesna, Ratković Jelena, Čokorilo Ilić Marina. "Application of the VIKOR and FAHP multi-criteria optimisation methods for choosing the optimal groundwater control system: case of pumping station Bezdan 1 (Serbia)" in Proceedings of the national conference with international participation „Geosciences 2017“, Sofia:Bulgarian Geological Society (2017): 131-132
-
Determining the Groundwater Balance and Radius of Influence Using Hydrodynamic Modeling: the Case Study of the Groundwater Source “Šumice” (Kikinda, Serbia)
A groundwater flow model was developed to simulate groundwater extraction from the public water supply source of the City of Kikinda. The hydrodynamic model includes the municipal groundwater source of Kikinda (Šumice and the Jezero Well), but also an extended area where there are groundwater sources that provide water supply to three factories: (MSK, TM and LŽT - Kikinda). Hydrodynamic modeling, based on the numerical method of finite differences will show the groundwater balance of the sources in the ...Dušan Polomčić, Dragoljub Bajić, Jelena Zarić. "Determining the Groundwater Balance and Radius of Influence Using Hydrodynamic Modeling: the Case Study of the Groundwater Source “Šumice” (Kikinda, Serbia)" in Journal of Sustainable Development of Energy, Water and Environment Systems (2015). https://doi.org/10.13044/j.sdewes.2015.03.0017
-
The Importance of Detailed Groundwater Monitoring for Underground Structure in Karst (Case Study: HPP Pirot, Southeastern Serbia)
Marina Čokorilo Ilić, Ana Mladenović, Marina Ćuk, Igor Jemcov. "The Importance of Detailed Groundwater Monitoring for Underground Structure in Karst (Case Study: HPP Pirot, Southeastern Serbia)" in Water, MDPI AG (2019). https://doi.org/10.3390/w11030603
-
INVENTS: A Hybrid Mine Ventilation Planning and Design System
Ventilation system analysis is a complex process based on the calculation and analysis of numerous parameters. These problems can be successfully solved by the SimVent numerical package, but a full understanding and use of the obtained results require the involvement of an experienced specialist in the ventilation field. The solution was found in the creation of a hybrid system INVENTS, whose knowledge base represents a formalization of the expert knowledge in the mine ventilation field. In this paper we ...Lilić Nikola, Stanković Ranka, Obradović Ivan. "INVENTS: A Hybrid Mine Ventilation Planning and Design System" in Proceedings of International Scientific Conference of FME Session 4: Automation Control and Applied Informatics , Hong Kong : iConcept Press (2013)
-
Geochemical and Sedimentation History of Neogene Lacustrine Sediments from the Valjevo-Mionica Basin (Serbia)
Šajnović Aleksandra, Stojanović Ksenija, Simić Vladimir, Jovančićević Branimir. "Geochemical and Sedimentation History of Neogene Lacustrine Sediments from the Valjevo-Mionica Basin (Serbia)" in Geochemistry - Earth's System Processes, San Francisco State University, United States:Intech: The international journal of instrumentation and control, The Instrumentation, Systems and Automation Society (2012): 1-26. https://doi.org/10.5772/32180
-
Automated blasthole drilling in surface mining
Milanka Negovanović, Lazar Kričak (2021)Све већи развој аутоматизације у рударској индустрији утицао је на увођење нових решења у области аутоматизације бушења минских бушотина на површинским коповима. Највећи светски произвођачи опреме за бушење развијају решења аутоматизације која омогућавају рударским компанијама да постигну најбоље резултате у погледу квалитета, продуктивности и оперативних трошкова. Решења из области аутоматизације бушења се крећу од операција даљинског управљања до потпуно аутоматизованог бушења, праћења података у реалном времену и разних специјализованих алата за управљање подацима који повећавају безбедност и продуктивност ...Аутоматизација, бушилица,тачност, бушење,рударство,систем даљинског управљања,безбедност, продуктивностMilanka Negovanović, Lazar Kričak . "Automated blasthole drilling in surface mining" in 8th International Conference Mining And Environmental Protection, Sokobanja, 22 – 25th September 2021 Serbia, University of Belgrade, Faculty of Mining and Geology, Belgrade, Serbia (2021)
-
Multicriteria Analysis and Optimization of Groundwater Control Systems with Variable Values of Criterion over Predefined Time Points
Milica Stepanović, Dragoljub Bajić, Dušan Polomčić. "Multicriteria Analysis and Optimization of Groundwater Control Systems with Variable Values of Criterion over Predefined Time Points" in Comptes rendus de l'Académie Bulgare des Sciences, "Prof. Marin Drinov" Publishing House of Bulgarian Academy of Sciences (2021). https://doi.org/10.7546/CRABS.2021.08.09
-
Approach to operational mine planning: Case study Tamnava West
Dejan Stevanović, Mirjana Banković, Milica Pešić Georgiadis, Ranka Stanković. "Approach to operational mine planning: Case study Tamnava West" in Tehnika, Beograd : Savez inženjera i tehničara Srbije (2014). https://doi.org/10.5937/tehnika1406952S
-
Flood protection and water utilization of karst poljes: example of Gatačko Polje, Eastern Herzegovina
Tina Dašić, Ljiljana Vasić (2020)Earth-Surface Processes,Geology, Pollution, Soil Science, Water Science and Technology, Environmental Chemistry,Global and Planetary ChangeTina Dašić, Ljiljana Vasić. "Flood protection and water utilization of karst poljes: example of Gatačko Polje, Eastern Herzegovina" in Environmental Earth Sciences, Springer Science and Business Media LLC (2020). https://doi.org/10.1007/s12665-020-08987-4