Collected Item: “Possibility of application of fuzzy logic for stability assessment of underground facilities”
Врста публикације
Рад у зборнику
Верзија документа
објављена
Језик
енглески
Аутор/и (Милан Марковић, Никола Николић)
Crnogorac Luka, Tokalić Rade, Nikšić Đurica, Jovanović Saša
Наслов рада (Наслов - поднаслов)
Possibility of application of fuzzy logic for stability assessment of underground facilities
Назив конференције (зборника), место и датум одржавања
Mining and environmental protection, Vrdnik, 25 - 28 September 2019.
Издавач (Београд : Просвета)
University of Belgrade, Faculty of Mining and geology, Belgrade, Serbia
Година издавања
2019
Сажетак рада на српском језику
Rudnici sa podzemnom eksploatacijom uglja u Republici Srbiji deo su Javnog preduzeća za podzemnu eksploataciju uglja Resavica (JP PEU). U rudnicima kompanije JP PEU podzemne prostorije se trenutno grade tehnologijom bušenja i miniranja. Ova metoda, koja se koristi u srpskim rudnicima uglja, pokazala je svojom brzinom, efikasnošću, troškovima i drugim elementima da više nije prihvatljiva. Klasičan metod izgradnje podzemnih prostorija ne omogućava zadovoljavajuću produktivnost, jer se tehnološke operacije ovog metoda, bušenje i miniranje, izvode ručno i zahtevaju neprihvatljivo mnogo vremena.
S obzirom na ovu činjenicu, kao i na ranija kašnjenja u otvaranju i pripremi novih proizvodnih kapaciteta, trenutni metod njihove pripreme vodi ka stagnaciji u širenju sistema prostorija u rudnicima i ne omogućava povećanje proizvodnje uglja. Da bi se povećala proizvodnja uglja i otvorili novi kopovi i rudarska polja, neophodno je razmotriti primenu produktivnijih metoda izgradnje podzemnih prostorija, odnosno primenu mašina za njihovu izgradnju.
Nabavka nove opreme zahteva velika ulaganja, te je potrebno sprovesti detaljnu analizu tehnološkog procesa podzemne eksploatacije i odabrati mašinu za izgradnju podzemnih prostorija koja će ispuniti postavljene uslove. Za pravilnu selekciju mašine za izgradnju podzemnih prostorija u uslovima srpskih rudnika uglja, korišćena je višekriterijumska analiza, kako je opisano u ovom radu.
Сажетак рада на енглеском језику
The mines with underground exploitation of coal in the Republic of Serbia are part of the Public Enterprise for Underground Exploitation of Coal Resavica (JP PEU). In the mines of the company JP PEU, underground rooms are presently being construction by the technology of drilling and blasting works. This method which is used in Serbian coal mines, has shown with its speed, performance, costs and other elements that it is not acceptable anymore. Classical method of construction of underground rooms does not allow satisfying performance, because technological operations of this method, drilling and blasting are performing manually and require unacceptably big time consuming. Regarding this fact and also earlier delays of opening and preparing new production capacities, present method of their preparation guides to stagnation in spreading room system in mines and does not allow increasing of coal production. In order to increase coal production and opening of new pits and mining fields, it is necessary to consider the application of more productive methods of construction of underground rooms, i.e. application of machines for construction of underground rooms. Procurement of new equipment requires large investments, therefore it is necessary to carry out a detailed examination of the technological process of pit production and to select a machine for the construction of underground rooms that will meet the specified conditions. In order to properly select the machine for construction of underground rooms for the conditions of coal mines in Serbia, a multi-criteria analysis was used, as given in this paper.
ISBN број изворне публикације
ISBN 978-86-7352-354-5
Кључне речи на српском (одвојене знаком ", ")
Analiza, podzemna prostorija, mehanizovana izgradnja, rudnik.
Кључне речи на енглеском (одвојене знаком ", ")
Analysis, underground room, mechanized building, mine.
Шира категорија рада према правилнику МПНТ
М30
Ужа категорија рада према правилнику МПНТ
М33
Ниво приступа
Отворени приступ
Лиценца
Creative Commons – Attribution-NonComercial 4.0 International
Формат датотеке
.pdf